Differences between revisions 703 and 705 (spanning 2 versions)
Revision 703 as of 2013-01-18 11:20:27
Size: 1298
Editor: lt-ck
Comment:
Revision 705 as of 2013-01-23 10:55:04
Size: 1330
Editor: 201
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
6; 5.-12.2.; ?;; 6; 5.-12.2.; J.L.Santaren/F.Damour (operators);;
Line 15: Line 15:
9; 26.2.-5.3.; J.L.Santaren/M.Ruiz (operators);; 9; 26.2.-5.3.; I.Ruiz/J.L.Santaren (operators);;

1 1.-8.1.2013 G.Bruni
2 8.-15.1.2013 A.Sievers
3 15.-22.1.2013 M.Gonzalez Pool
4 22.-29.1.2013 N.Billot Pool
5 29.1.-5.2. S.Trevino
6 5.-12.2. J.L.Santaren/F.Damour (operators)
7 12.-19.2. M.Gonzalez Pool
8 19.-26.2. N.Billot Pool
9 26.2.-5.3. I.Ruiz/J.L.Santaren (operators)
10 5.-12.3. S.Trevino
11 12.-19.3. M.Gonzalez 15.-18. J.LeBourlot with students
12 19.-26.3. G.Paubert Pool & 1mm VLBI 21.-28.3.
13 26.3.-2.4. F.Damour (day-time operator) Pool & 1mm VLBI (till 28.3.), Semana Santa
14 2.-9.4. S.Trevino
15 9.-16.4. A.Sievers GISMO-Pool (10./11. PC meeting)
16 16.-23.4. C.Kramer GISMO-Pool
17 23.-30.4. ? GISMO-Pool
18 30.4.-7.5. S.Trevino
19 7.-14.5. M.Gonzalez
20 14.-21.5. 3mm VLBI (16.-22.5.)
21 21.-28.5.
22 28.-4.6. ? Start of Summer Semester
23 4.-11.6. S.Trevino
24 11.-18.6. N.Billot NIKA run
25 18.-25.6.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)