Differences between revisions 697 and 998 (spanning 301 versions)
Revision 697 as of 2013-01-14 13:39:14
Size: 1008
Editor: lt-ck
Comment:
Revision 998 as of 2016-11-23 08:49:12
Size: 714
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:

= 2017 =
Line 7: Line 9:
1; 1.-8.1.2013; G.Bruni;;
2; 8.-15.1.2013; A.Sievers;;
3; 15.-22.1.2013; M.Gonzalez; Pool;
4; 22.-29.1.2013; N.Billot; Pool;
5; 29.1.-5.2.; S.Trevino;;
6; 5.-12.2.; G.Bruni;;
7; 12.-19.2.; M.Gonzalez; Pool;
8; 19.-26.2.; N.Billot; Pool;
9; 26.2.-5.3.; J.L.Santaren/M.Ruiz (operators);;
10; 5.-12.3.; S.Trevino;;
11; 12.-19.3.; G.Bruni (weekend: M.Gonzalez); 15.-18. J.LeBourlot with students;
12; 19.-26.3.; G.Paubert;;
13; 26.3.-2.4.; ? ; Semana Santa;
14; 2.-9.4.; S.Trevino;;
15; 9.-16.4.; A.Sievers; GISMO-Pool (10./11. PC meeting);
16; 16.-23.4.; C.Kramer; GISMO-Pool;
17; 23.-30.4.; G.Bruni; GISMO-Pool;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week, 4./5. 0.8mm VLBI 30m-NOEMA test slot;
2; 10.-17.1.; H.Ungerechts (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch to mrt-cal ?;
4; 24.-31.1.; P.Garcia; NIKA2 commissioning week ?;
5; 31.1.-7.2.;;;
Line 27: Line 17:
 * AodSchedule16
 * AodSchedule15
 * AodSchedule14
 * AodSchedule13

2017

1 3.-10.1. P.Torne Heterodyne Pool Week, 4./5. 0.8mm VLBI 30m-NOEMA test slot
2 10.-17.1. H.Ungerechts (remote from Granada)
3 17.-24.1. A.Sievers Switch to mrt-cal ?
4 24.-31.1. P.Garcia NIKA2 commissioning week ?
5 31.1.-7.2.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)