Size: 2155
Comment:
|
Size: 1380
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
27;3.-10.7.; H.Ungerechts;; 28;10.-17.7.; M.Gonzalez; YIG Band 4 tests; 29;17.-24.7.; J.Abreu ; AMSTAR+/HEMT on-sky tests; 30;24.-31.7.; G.Bruni (C.Buchbender 27.-31.7.);; 31;31.7.-7.8.; S.Trevino ;; 32;7.-14.8.; N.Billot;; 33;14.-21.8.; J.Abreu ;; 34;21.-28.8.; G.Bruni;; 35;28.8.-4.9.; M.Ruiz/F.Damour (operators);; 36;4.-11.9.; H.Ungerechts ;; 37;11.-18.9.; G.Paubert ;; 38;18.-25.9.; I.Ruiz/E.Lobato (operators) ; Heavy Maintenance: Holo-Rx, Gearboxes; 39;25.9.-2.10.; S.Trevino;; 40;2.-9.10.; J.Abreu;; 41;9.-16.10.; S.Trevino(9-11.10)/G.Bruni(11-18.10)/J.Abreu(11-16.10); Heterodyne Pool Week; 42;16.-23.10.; M.Gonzalez/G.Bruni(11-18.10); Heterodyne Pool Week; 43;23.-30.10.; J.Abreu;; 44; 30.10.-6.11.; C.Kramer, M.Gonzalez (30.-2.11.); GISMO Pool Week I; 45; 6.-13.11.; N.Billot (5.-8.11.), G.Bruni (6.-13.11.); GISMO Pool Week II; 46; 13.-20.11.; A.Sievers; NIKA Installation; 47; 20.-27.11.; N.Billot; NIKA Week; 48; 27.11.-4.12.; J.Abreu;; 49; 4.-11.12.; G.Paubert;; 50; 11.-18.12.; N.Billot;; 51; 18.-25.12.; J.Santiago/F.Damour (operators); 17.-21. B.Lefloch with students; 51; 25.12.-1.1.2013; S.Trevino;; |
|
Line 38: | Line 12: |
6; 5.-12.2.; G.Bruni;; 7; 12.-19.2.; M.Gonzalez; Pool; 8; 19.-26.2.; N.Billot; Pool; 9; 26.2.-5.3.; J.L.Santaren/M.Ruiz (operators);; |
6; 5.-12.2.; J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.;; 7; 12.-19.2.; N.Billot; Pool, VLBI test on 14. or 18.2.; 8; 19.-26.2.; M.Gonzalez; Pool; 9; 26.2.-5.3.; J.L.Santaren (night-time operator);; |
Line 43: | Line 17: |
11; 12.-19.3.; G.Bruni (weekend: M.Gonzalez); 15.-18. J.LeBourlot with students; 12; 19.-26.3.; G.Paubert;; 13; 26.3.-2.4.; ? ; Semana Santa; |
11; 12.-19.3.; M.Gonzalez; 15.-18. J.LeBourlot with students; 12; 19.-26.3.; G.Paubert; Pool & 1mm VLBI 21.-28.3.; 13; 26.3.-2.4.; F.Damour (day-time operator); Pool & 1mm VLBI (till 28.3.), Semana Santa; |
Line 49: | Line 23: |
17; 23.-30.4.; G.Bruni; GISMO-Pool; | 17; 23.-30.4.; ?; GISMO-Pool; 18; 30.4.-7.5.; S.Trevino;; 19; 7.-14.5.; M.Gonzalez;; 20; 14.-21.5.;; 3mm VLBI (16.-22.5.); 21; 21.-28.5.;;; 22; 28.-4.6.; ?; Start of Summer Semester; 23; 4.-11.6.; S.Trevino;; 24; 11.-18.6.; N.Billot; NIKA run; 25; 18.-25.6.;;; |