Differences between revisions 696 and 711 (spanning 15 versions)
Revision 696 as of 2013-01-14 13:37:47
Size: 2155
Editor: lt-ck
Comment:
Revision 711 as of 2013-02-11 08:43:03
Size: 1380
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
27;3.-10.7.; H.Ungerechts;;
28;10.-17.7.; M.Gonzalez; YIG Band 4 tests;
29;17.-24.7.; J.Abreu ; AMSTAR+/HEMT on-sky tests;
30;24.-31.7.; G.Bruni (C.Buchbender 27.-31.7.);;
31;31.7.-7.8.; S.Trevino ;;
32;7.-14.8.; N.Billot;;
33;14.-21.8.; J.Abreu ;;
34;21.-28.8.; G.Bruni;;
35;28.8.-4.9.; M.Ruiz/F.Damour (operators);;
36;4.-11.9.; H.Ungerechts ;;
37;11.-18.9.; G.Paubert ;;
38;18.-25.9.; I.Ruiz/E.Lobato (operators) ; Heavy Maintenance: Holo-Rx, Gearboxes;
39;25.9.-2.10.; S.Trevino;;
40;2.-9.10.; J.Abreu;;
41;9.-16.10.; S.Trevino(9-11.10)/G.Bruni(11-18.10)/J.Abreu(11-16.10); Heterodyne Pool Week;
42;16.-23.10.; M.Gonzalez/G.Bruni(11-18.10); Heterodyne Pool Week;
43;23.-30.10.; J.Abreu;;
44; 30.10.-6.11.; C.Kramer, M.Gonzalez (30.-2.11.); GISMO Pool Week I;
45; 6.-13.11.; N.Billot (5.-8.11.), G.Bruni (6.-13.11.); GISMO Pool Week II;
46; 13.-20.11.; A.Sievers; NIKA Installation;
47; 20.-27.11.; N.Billot; NIKA Week;
48; 27.11.-4.12.; J.Abreu;;
49; 4.-11.12.; G.Paubert;;
50; 11.-18.12.; N.Billot;;
51; 18.-25.12.; J.Santiago/F.Damour (operators); 17.-21. B.Lefloch with students;
51; 25.12.-1.1.2013; S.Trevino;;
Line 38: Line 12:
6; 5.-12.2.; G.Bruni;;
7; 12.-19.2.; M.Gonzalez; Pool;
8; 19.-26.2.; N.Billot; Pool;
9; 26.2.-5.3.; J.L.Santaren/M.Ruiz (operators);;
6; 5.-12.2.; J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.;;
7; 12.-19.2.; N.Billot; Pool, VLBI test on 14. or 18.2.;
8; 19.-26.2.; M.Gonzalez; Pool;
9; 26.2.-5.3.; J.L.Santaren (night-time operator);;
Line 43: Line 17:
11; 12.-19.3.; G.Bruni (weekend: M.Gonzalez); 15.-18. J.LeBourlot with students;
12; 19.-26.3.; G.Paubert;;
13; 26.3.-2.4.; ? ; Semana Santa;
11; 12.-19.3.; M.Gonzalez; 15.-18. J.LeBourlot with students;
12; 19.-26.3.; G.Paubert; Pool & 1mm VLBI 21.-28.3.;
13; 26.3.-2.4.; F.Damour (day-time operator); Pool & 1mm VLBI (till 28.3.), Semana Santa;
Line 49: Line 23:
17; 23.-30.4.; G.Bruni; GISMO-Pool; 17; 23.-30.4.; ?; GISMO-Pool;
18; 30.4.-7.5.; S.Trevino;;
19; 7.-14.5.; M.Gonzalez;;
20; 14.-21.5.;; 3mm VLBI (16.-22.5.);
21; 21.-28.5.;;;
22; 28.-4.6.; ?; Start of Summer Semester;
23; 4.-11.6.; S.Trevino;;
24; 11.-18.6.; N.Billot; NIKA run;
25; 18.-25.6.;;;

1 1.-8.1.2013 G.Bruni
2 8.-15.1.2013 A.Sievers
3 15.-22.1.2013 M.Gonzalez Pool
4 22.-29.1.2013 N.Billot Pool
5 29.1.-5.2. S.Trevino
6 5.-12.2. J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.
7 12.-19.2. N.Billot Pool, VLBI test on 14. or 18.2.
8 19.-26.2. M.Gonzalez Pool
9 26.2.-5.3. J.L.Santaren (night-time operator)
10 5.-12.3. S.Trevino
11 12.-19.3. M.Gonzalez 15.-18. J.LeBourlot with students
12 19.-26.3. G.Paubert Pool & 1mm VLBI 21.-28.3.
13 26.3.-2.4. F.Damour (day-time operator) Pool & 1mm VLBI (till 28.3.), Semana Santa
14 2.-9.4. S.Trevino
15 9.-16.4. A.Sievers GISMO-Pool (10./11. PC meeting)
16 16.-23.4. C.Kramer GISMO-Pool
17 23.-30.4. ? GISMO-Pool
18 30.4.-7.5. S.Trevino
19 7.-14.5. M.Gonzalez
20 14.-21.5. 3mm VLBI (16.-22.5.)
21 21.-28.5.
22 28.-4.6. ? Start of Summer Semester
23 4.-11.6. S.Trevino
24 11.-18.6. N.Billot NIKA run
25 18.-25.6.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)