Differences between revisions 696 and 697
Revision 696 as of 2013-01-14 13:37:47
Size: 2155
Editor: lt-ck
Comment:
Revision 697 as of 2013-01-14 13:39:14
Size: 1008
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
27;3.-10.7.; H.Ungerechts;;
28;10.-17.7.; M.Gonzalez; YIG Band 4 tests;
29;17.-24.7.; J.Abreu ; AMSTAR+/HEMT on-sky tests;
30;24.-31.7.; G.Bruni (C.Buchbender 27.-31.7.);;
31;31.7.-7.8.; S.Trevino ;;
32;7.-14.8.; N.Billot;;
33;14.-21.8.; J.Abreu ;;
34;21.-28.8.; G.Bruni;;
35;28.8.-4.9.; M.Ruiz/F.Damour (operators);;
36;4.-11.9.; H.Ungerechts ;;
37;11.-18.9.; G.Paubert ;;
38;18.-25.9.; I.Ruiz/E.Lobato (operators) ; Heavy Maintenance: Holo-Rx, Gearboxes;
39;25.9.-2.10.; S.Trevino;;
40;2.-9.10.; J.Abreu;;
41;9.-16.10.; S.Trevino(9-11.10)/G.Bruni(11-18.10)/J.Abreu(11-16.10); Heterodyne Pool Week;
42;16.-23.10.; M.Gonzalez/G.Bruni(11-18.10); Heterodyne Pool Week;
43;23.-30.10.; J.Abreu;;
44; 30.10.-6.11.; C.Kramer, M.Gonzalez (30.-2.11.); GISMO Pool Week I;
45; 6.-13.11.; N.Billot (5.-8.11.), G.Bruni (6.-13.11.); GISMO Pool Week II;
46; 13.-20.11.; A.Sievers; NIKA Installation;
47; 20.-27.11.; N.Billot; NIKA Week;
48; 27.11.-4.12.; J.Abreu;;
49; 4.-11.12.; G.Paubert;;
50; 11.-18.12.; N.Billot;;
51; 18.-25.12.; J.Santiago/F.Damour (operators); 17.-21. B.Lefloch with students;
51; 25.12.-1.1.2013; S.Trevino;;

1 1.-8.1.2013 G.Bruni
2 8.-15.1.2013 A.Sievers
3 15.-22.1.2013 M.Gonzalez Pool
4 22.-29.1.2013 N.Billot Pool
5 29.1.-5.2. S.Trevino
6 5.-12.2. G.Bruni
7 12.-19.2. M.Gonzalez Pool
8 19.-26.2. N.Billot Pool
9 26.2.-5.3. J.L.Santaren/M.Ruiz (operators)
10 5.-12.3. S.Trevino
11 12.-19.3. G.Bruni (weekend: M.Gonzalez) 15.-18. J.LeBourlot with students
12 19.-26.3. G.Paubert
13 26.3.-2.4. ? Semana Santa
14 2.-9.4. S.Trevino
15 9.-16.4. A.Sievers GISMO-Pool (10./11. PC meeting)
16 16.-23.4. C.Kramer GISMO-Pool
17 23.-30.4. G.Bruni GISMO-Pool

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)