27;3.-10.7.; H.Ungerechts;;
28;10.-17.7.; M.Gonzalez; YIG Band 4 tests;
29;17.-24.7.; J.Abreu ; AMSTAR+/HEMT on-sky tests;
30;24.-31.7.; G.Bruni (C.Buchbender 27.-31.7.);;
31;31.7.-7.8.; S.Trevino ;;
32;7.-14.8.; N.Billot;;
33;14.-21.8.; J.Abreu ;;
34;21.-28.8.; G.Bruni;;
35;28.8.-4.9.; M.Ruiz/F.Damour (operators);;
36;4.-11.9.; H.Ungerechts ;;
37;11.-18.9.; G.Paubert ;;
38;18.-25.9.; I.Ruiz/E.Lobato (operators) ; Heavy Maintenance: Holo-Rx, Gearboxes;
39;25.9.-2.10.; S.Trevino;;
40;2.-9.10.; J.Abreu;;
41;9.-16.10.; S.Trevino(9-11.10)/G.Bruni(11-18.10)/J.Abreu(11-16.10); Heterodyne Pool Week;
42;16.-23.10.; M.Gonzalez/G.Bruni(11-18.10); Heterodyne Pool Week;
43;23.-30.10.; J.Abreu;;
44; 30.10.-6.11.; C.Kramer, M.Gonzalez (30.-2.11.); GISMO Pool Week I;
45; 6.-13.11.; N.Billot (5.-8.11.), G.Bruni (6.-13.11.); GISMO Pool Week II;
46; 13.-20.11.; A.Sievers; NIKA Installation;
47; 20.-27.11.; N.Billot; NIKA Week;
48; 27.11.-4.12.; J.Abreu;;
49; 4.-11.12.; G.Paubert;;
50; 11.-18.12.; N.Billot;;
51; 18.-25.12.; J.Santiago/F.Damour (operators); Students with B.Lefloch 17.-21.12.;
51; 25.12.-1.1.2013; S.Trevino;;
1; 1.-8.1.2013; G.Bruni;;
2; 8.-15.1.2013; A.Sievers;;
3; 15.-22.1.2013; M.Gonzalez; Pool;
4; 22.-29.1.2013; N.Billot; Pool;
5; 29.1.-5.2.; S.Trevino;;
6; 5.-12.2.; G.Bruni;;
7; 12.-19.2.; G.Paubert; Pool;
8; 19.-26.2.; M.Gonzalez; Pool;
9; 26.2.-5.3.; S.Trevino;;
10; 5.-12.3.; J.L.Santaren/F.Damour (operators);;
11; 12.-19.3.; G.Bruni;;
12; 19.-26.3.; N.Billot;;
13; 26.3.-2.4.; J.L.Santaren/M.Ruiz (operators);;
14; 2.-9.4.; S.Trevino;;
15; 9.-16.4.; S.Sievers; GISMO-Pool (10./11. PC meeting);
16; 16.-23.4.; C.Kramer; GISMO-Pool;
17; 23.-30.4.; G.Bruni; GISMO-Pool;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week, 4./5. 0.8mm VLBI 30m-NOEMA test slot;
2; 10.-17.1.; H.Ungerechts (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch to mrt-cal ?;
4; 24.-31.1.; P.Garcia; NIKA2 commissioning week ?;
5; 31.1.-7.2.;;;
Line 53: Line 15:
 * AodSchedule112, AodSchedule212  * AodSchedule16
 * AodSchedule15
 * AodSchedule14
 * AodSchedule13
 * AodSchedule112, AodSchedule212, AodSchedule3412

1 3.-10.1. P.Torne Heterodyne Pool Week, 4./5. 0.8mm VLBI 30m-NOEMA test slot
2 10.-17.1. H.Ungerechts (remote from Granada)
3 17.-24.1. A.Sievers Switch to mrt-cal ?
4 24.-31.1. P.Garcia NIKA2 commissioning week ?
5 31.1.-7.2.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)