Differences between revisions 68 and 1022 (spanning 954 versions)
Revision 68 as of 2006-12-05 10:39:38
Size: 1198
Editor: visitor6
Comment:
Revision 1022 as of 2017-01-11 08:55:37
Size: 1565
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
##language:en #language:en
Line 4: Line 4:
= 2017 =
Line 5: Line 6:
{{{
#!CSV
;;;;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week;
2; 10.-17.1.; G.Paubert (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot;
4; 24.-31.1.; P.Garcia; 6hours NIKA2 slot, possible 4hours 1mm VLBI slots;
5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot;
6; 7.-14.2.; H.Ungerechts (remote from Granada); 10.2.: 0.8mm VLBI test slot;
7; 14.-21.2.; P.Torne; 15.2.: 0.8mm VLBI test slot;
8; 21.-28.2.; P.Garcia / A.Ritacco; NIKA2 commissioning week;
9; 28.2.-7.3.;G.Paubert (remote from Granada);;
10; 7.-14.3.;C.Marka/ A.Ritacco; 11.-13.3. A.Maury+Students;
11; 14.-21.3.;A.Sievers (remote from Granada); 16.3. IRAM Proposal Deadline;
12; 21.-28.3.;P.Garcia;;
13; 28.3.-4.4.; P.Torne; 30.3.-4.4. VLBI/GMVA 3mm Session;
14; 4.-11.4.; C.Marka / A.Ritacco; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
15; 11.-18.4.; P.Torne; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
16; 18.-25.4.;;;
17; 25.4.-2.5.;;;
18; 2.-9.5.;;;
19; 9.-16.5.;;;
20; 16.-23.5.;;;
21; 23.-30.5.;; End of winter semester W16;
22; 30.5.-6.6.;;;
}}}
Line 6: Line 33:
{{{#!CSV
Week ; Dates ; AoD ; Comments
40; 3.10.-10.10.;Leon; Mambo pool
41; 10.10.-17.10.;Leon(Tue-Thu, Sun-Tue), MRuiz (Thu-Sun); Mambo Pool (Tue-Wed), VLBI (Thu-Tue)
42; 17.10.-24.10.; Ocana ; Mambo Pool
43; 24.10.-31.10.; Wiesemeyer; HERA Pool
44; 31.10.-7.11.;Paubert(Tue-Fri) Sievers(Fri-Tue); HERA Pool
45; 7.11.-14.11.; Wiesemeyer; HERA Pool
46; 14.11.-21.11.;Leon(Tue-Fri), Ungerechts (Fri-Tue); Mambo Pool (till Fri)
47; 21.11.-28.11.;Paubert;
48; 28.11.-5.12.;Thum (Tue-Fri), Marcelino (Fri-Tue);
49; 5.12.-12.12.;Leon;Mambo-Pool
50; 12.12.-19.12.;Ocana;Mambo Pool
51; 19.12.-26.12.;Leon(Tue-Fri); Mambo Pool
52; 26.12.-2.1.2007;Ocana;
1;2.1.-9.1.;Marcelino;
2;9.1.-16.1.;Wiesemeyer;HERA Pool
3;16.1.-23.1.;Paubert;HERA Pool
4;23.1.-30.1.;Wiesemeyer(Tue-Fri), Marcelino (Fri-Tue);HERA Pool
5;30.1.-6.2.;Leon; Mambo Pool
6;6.2.-13.2.;Ocana; Mambo Pool
7;13.2.-20.2.;Leon; Mambo Pool
8;20.2.-27.2.;Wiesemeyer;HERA Pool
9;27.2.-6.3.;Sievers;HERA Pool
10;6.3.-13.3.;Wiesemeyer;HERA Pool
11;13.3.-20.3.;Ungerechts;
12;20.3.-27.2.;Leon;Mambo Pool
13;27.2.-3.4.;Ocana;Mambo Pool
13;3.4.-10.4.;Leon;Mambo Pool
}}}
Old AoD Plans:
 * AodSchedule16
 * AodSchedule15
 * AodSchedule14
 * AodSchedule13
 * AodSchedule112, AodSchedule212, AodSchedule3412
 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111
 * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110
 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
 * AodSchedule408, AodSchedule308

2017

1 3.-10.1. P.Torne Heterodyne Pool Week
2 10.-17.1. G.Paubert (remote from Granada)
3 17.-24.1. A.Sievers Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot
4 24.-31.1. P.Garcia 6hours NIKA2 slot, possible 4hours 1mm VLBI slots
5 31.1.-7.2. C.Marka Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot
6 7.-14.2. H.Ungerechts (remote from Granada) 10.2.: 0.8mm VLBI test slot
7 14.-21.2. P.Torne 15.2.: 0.8mm VLBI test slot
8 21.-28.2. P.Garcia / A.Ritacco NIKA2 commissioning week
9 28.2.-7.3. G.Paubert (remote from Granada)
10 7.-14.3. C.Marka/ A.Ritacco 11.-13.3. A.Maury+Students
11 14.-21.3. A.Sievers (remote from Granada) 16.3. IRAM Proposal Deadline
12 21.-28.3. P.Garcia
13 28.3.-4.4. P.Torne 30.3.-4.4. VLBI/GMVA 3mm Session
14 4.-11.4. C.Marka / A.Ritacco 5.-14.4.: VLBI/EHT 1mm Session and Pool
15 11.-18.4. P.Torne 5.-14.4.: VLBI/EHT 1mm Session and Pool
16 18.-25.4.
17 25.4.-2.5.
18 2.-9.5.
19 9.-16.5.
20 16.-23.5.
21 23.-30.5. End of winter semester W16
22 30.5.-6.6.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)