Differences between revisions 679 and 680
Revision 679 as of 2012-11-08 11:28:54
Size: 1538
Editor: lt-ck
Comment:
Revision 680 as of 2012-11-30 10:26:13
Size: 1654
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 33: Line 33:
52; 1.-8.1.2013; G.Bruni;; 1; 1.-8.1.2013; G.Bruni;;
2; 8.-15.1.2013; ;;
3;15.-22.1.2013; M.Gonzalez; Pool;
4;22.-29.1.2013; ; Pool;
5;29.1.-5.2.; ;;
6;5.-12.2.; ;;

27 3.-10.7. H.Ungerechts
28 10.-17.7. M.Gonzalez YIG Band 4 tests
29 17.-24.7. J.Abreu AMSTAR+/HEMT on-sky tests
30 24.-31.7. G.Bruni (C.Buchbender 27.-31.7.)
31 31.7.-7.8. S.Trevino
32 7.-14.8. N.Billot
33 14.-21.8. J.Abreu
34 21.-28.8. G.Bruni
35 28.8.-4.9. M.Ruiz/F.Damour (operators)
36 4.-11.9. H.Ungerechts
37 11.-18.9. G.Paubert
38 18.-25.9. I.Ruiz/E.Lobato (operators) Heavy Maintenance: Holo-Rx, Gearboxes
39 25.9.-2.10. S.Trevino
40 2.-9.10. J.Abreu
41 9.-16.10. S.Trevino(9-11.10)/G.Bruni(11-18.10)/J.Abreu(11-16.10) Heterodyne Pool Week
42 16.-23.10. M.Gonzalez/G.Bruni(11-18.10) Heterodyne Pool Week
43 23.-30.10. J.Abreu
44 30.10.-6.11. C.Kramer, M.Gonzalez (30.-2.11.) GISMO Pool Week I
45 6.-13.11. N.Billot (5.-8.11.), G.Bruni (6.-13.11.) GISMO Pool Week II
46 13.-20.11. A.Sievers NIKA Installation
47 20.-27.11. N.Billot NIKA Week
48 27.11.-4.12. J.Abreu
49 4.-11.12. G.Paubert
50 11.-18.12. N.Billot
51 18.-25.12. J.Santiago/F.Damour (operators) Students with B.Lefloch 17.-21.12.
51 25.12.-1.1.2013 S.Trevino
1 1.-8.1.2013 G.Bruni
2 8.-15.1.2013
3 15.-22.1.2013 M.Gonzalez Pool
4 22.-29.1.2013 Pool
5 29.1.-5.2.
6 5.-12.2.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)