Differences between revisions 674 and 758 (spanning 84 versions)
Revision 674 as of 2012-09-10 15:13:41
Size: 1496
Editor: lt-ck
Comment:
Revision 758 as of 2013-12-16 12:54:37
Size: 1096
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
27;3.-10.7.; H.Ungerechts;;
28;10.-17.7.; M.Gonzalez; YIG Band 4 tests;
29;17.-24.7.; J.Abreu ; AMSTAR+/HEMT on-sky tests;
30;24.-31.7.; G.Bruni (C.Buchbender 27.-31.7.);;
31;31.7.-7.8.; S.Trevino ;;
32;7.-14.8.; N.Billot;;
33;14.-21.8.; J.Abreu ;;
34;21.-28.8.; G.Bruni;;
35;28.8.-4.9.; M.Ruiz/F.Damour (operators);;
36;4.-11.9.; H.Ungerechts ;;
37;11.-18.9.; G.Paubert ;;
38;18.-25.9.; I.Ruiz/E.Lobato (operators) ; Heavy Maintenance: Holo-Rx, Gearboxes;
39;25.9.-2.10.; S.Trevino;;
40;2.-9.10.; J.Abreu;;
41;9.-16.10.; S.Trevino/G.Bruni(11-18.10); Heterodyne Pool Week;
42;16.-23.10.; M.Gonzalez/G.Bruni(11-18.10); Heterodyne Pool Week;
43;23.-30.10.; J.Abreu;;
44; 30.10.-6.11.; C.Kramer (30.10.-6.11.), M.Gonzalez (30.-2.11.); GISMO Pool Week I;
45; 6.-13.11.; N.Billot (5.-9.11.), G.Bruni (6.-13.11.); GISMO Pool Week II;
46; 13.-20.11.; A.Sievers; NIKA Installation;
47; 20.-27.11.; N.Billot; NIKA Week;
48; 27.11.-4.12.; H.Ungerechts;;
49; 4.-11.12.; G.Paubert;;
50; 11.-18.12.; N.Billot;;
51; 18.-25.12.; J.Santiago/F.Damour (operators);;
51; 25.12.-1.1.2013; S.Trevino;;
52; 1.-8.1.2013; G.Bruni;;
1; 31.12.-7.1.; J.L.Santaren & F.Damour (Operators, 31.12.-3.1.). G.Paubert (3.1.-7.1.);;
2; 7.-14.1.; M.Gonzalez; Heterodyne Pool;
3; 14.-21.1.; N.Billot; NIKA Cool down;
4; 21.-28.1.; A.Sievers; NIKA tests;
5; 28.1.-4.2.; ;;
6; 4.-11.2.; ;;
7; 11.18.2.; ; 14.: 8h VLBI;
8; 18.-25.2.; N.Billot; NIKA 1st open pool run (18.-28.2.);
9; 25.2.-4.3.; N.Billot (-28.3.), G.Paubert (28.2.-4.3.);;
10; 4.-11.3.; ;;
11; 11.-18.3.; ;;
12; 18.-25.3.; ;;
13; 25.-1.4.; ;;
14; 1.-8.4.; I.Hermelo; GISMO pool (1.-11.4.);
15; 8.-15.4.; M.Gonzalez;;
16; 15.-22.4.; ;;
17; 22.-29.4.; ;;
18; 29.4.-6.5.; ;;
19; 6.-13.5.; ;;
20; 13.-20.5.; ;;
21; 20.-27.5.; M.Ruiz (Operator);3mm VLBI (22.-28.5.);
Line 37: Line 31:
 * AodSchedule112, AodSchedule212  * AodSchedule13
* AodSchedule112, AodSchedule212, AodSchedule3412

1 31.12.-7.1. J.L.Santaren & F.Damour (Operators, 31.12.-3.1.). G.Paubert (3.1.-7.1.)
2 7.-14.1. M.Gonzalez Heterodyne Pool
3 14.-21.1. N.Billot NIKA Cool down
4 21.-28.1. A.Sievers NIKA tests
5 28.1.-4.2.
6 4.-11.2.
7 11.18.2. 14.: 8h VLBI
8 18.-25.2. N.Billot NIKA 1st open pool run (18.-28.2.)
9 25.2.-4.3. N.Billot (-28.3.), G.Paubert (28.2.-4.3.)
10 4.-11.3.
11 11.-18.3.
12 18.-25.3.
13 25.-1.4.
14 1.-8.4. I.Hermelo GISMO pool (1.-11.4.)
15 8.-15.4. M.Gonzalez
16 15.-22.4.
17 22.-29.4.
18 29.4.-6.5.
19 6.-13.5.
20 13.-20.5.
21 20.-27.5. M.Ruiz (Operator) 3mm VLBI (22.-28.5.)

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)