Differences between revisions 673 and 674
Revision 673 as of 2012-08-30 11:10:24
Size: 1500
Editor: gra-lx17
Comment:
Revision 674 as of 2012-09-10 15:13:41
Size: 1496
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 28: Line 28:
48; 27.11.-4.12.; H.Ungerechts?;;
49; 4.-11.12.; G.Paubert?;;
48; 27.11.-4.12.; H.Ungerechts;;
49; 4.-11.12.; G.Paubert;;
Line 32: Line 32:
51; 25.12.-1.1.2013; S.Trevino?;;
52; 1.-8.1.2013; G.Bruni?;;
51; 25.12.-1.1.2013; S.Trevino;;
52; 1.-8.1.2013; G.Bruni;;

27 3.-10.7. H.Ungerechts
28 10.-17.7. M.Gonzalez YIG Band 4 tests
29 17.-24.7. J.Abreu AMSTAR+/HEMT on-sky tests
30 24.-31.7. G.Bruni (C.Buchbender 27.-31.7.)
31 31.7.-7.8. S.Trevino
32 7.-14.8. N.Billot
33 14.-21.8. J.Abreu
34 21.-28.8. G.Bruni
35 28.8.-4.9. M.Ruiz/F.Damour (operators)
36 4.-11.9. H.Ungerechts
37 11.-18.9. G.Paubert
38 18.-25.9. I.Ruiz/E.Lobato (operators) Heavy Maintenance: Holo-Rx, Gearboxes
39 25.9.-2.10. S.Trevino
40 2.-9.10. J.Abreu
41 9.-16.10. S.Trevino/G.Bruni(11-18.10) Heterodyne Pool Week
42 16.-23.10. M.Gonzalez/G.Bruni(11-18.10) Heterodyne Pool Week
43 23.-30.10. J.Abreu
44 30.10.-6.11. C.Kramer (30.10.-6.11.), M.Gonzalez (30.-2.11.) GISMO Pool Week I
45 6.-13.11. N.Billot (5.-9.11.), G.Bruni (6.-13.11.) GISMO Pool Week II
46 13.-20.11. A.Sievers NIKA Installation
47 20.-27.11. N.Billot NIKA Week
48 27.11.-4.12. H.Ungerechts
49 4.-11.12. G.Paubert
50 11.-18.12. N.Billot
51 18.-25.12. J.Santiago/F.Damour (operators)
51 25.12.-1.1.2013 S.Trevino
52 1.-8.1.2013 G.Bruni

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)