|
Size: 1472
Comment:
|
Size: 1500
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 21: | Line 21: |
| 41;9.-16.10.; S.Trevino; Heterodyne Pool Week; 42;16.-23.10.; M.Gonzalez/G.Bruni; Heterodyne Pool Week; |
41;9.-16.10.; S.Trevino/G.Bruni(11-18.10); Heterodyne Pool Week; 42;16.-23.10.; M.Gonzalez/G.Bruni(11-18.10); Heterodyne Pool Week; |
