|
Size: 1287
Comment:
|
Size: 1365
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 18: | Line 18: |
| 38;18.-25.9.; I.Ruiz/E.Lobato (operators) ; Heavy Maintenance: Holo-Rx, Gearboxes;; 39;25.9.-2.10.;;;; 40;2.-9.10.;;;; 41;9.-16.10.;;;; 42;16.-23.10.;;;; 43;23.-30.10.;;;; 44; 30.-6.11.; C.Kramer (30.-6.11.), M.Gonzalez (30.-2.11.); GISMO Pool Week I; |
38;18.-25.9.; I.Ruiz/E.Lobato (operators) ; Heavy Maintenance: Holo-Rx, Gearboxes; 39;25.9.-2.10.; J.Abreu;; 40;2.-9.10.;;; 41;9.-16.10.; M.Gonzalez/G.Bruni; Heterodyne Pool Week; 42;16.-23.10.; S.Trevino; Heterodyne Pool Week; 43;23.-30.10.;;; 44; 30.10.-6.11.; C.Kramer (30.10.-6.11.), M.Gonzalez (30.-2.11.); GISMO Pool Week I; |
| Line 27: | Line 27: |
| 47; 20.-27.11.; N.Billot; NIKA Week 48; 27.11.-4.12.;;;; 49; 4.-11.12.;;;; |
47; 20.-27.11.; N.Billot; NIKA Week; 48; 27.11.-4.12.;;; 49; 4.-11.12.;;; |
