Size: 1287
Comment:
|
Size: 1359
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 19: | Line 19: |
39;25.9.-2.10.;;;; 40;2.-9.10.;;;; 41;9.-16.10.;;;; 42;16.-23.10.;;;; 43;23.-30.10.;;;; 44; 30.-6.11.; C.Kramer (30.-6.11.), M.Gonzalez (30.-2.11.); GISMO Pool Week I; |
39;25.9.-2.10.;;; 40;2.-9.10.;;; 41;9.-16.10.; M.Gonzalez/G.Bruni; Heterodyne Pool Week; 42;16.-23.10.; S.Trevino; Heterodyne Pool Week; 43;23.-30.10.;;; 44; 30.10.-6.11.; C.Kramer (30.10.-6.11.), M.Gonzalez (30.-2.11.); GISMO Pool Week I; |