|
Size: 1930
Comment:
|
Size: 1383
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 7: | Line 7: |
| Week ; Dates ; AoD ; Comments;; 13;27.-3.4.; J.Abreu;; 14;3.-10.4.; S.Trevino; Semana Santa; 15;10.-17.4.; A.Sievers; GISMO Week I; 16;17.-24.4.; J.Abreu; GISMO Week II, PC-Meeting 24./25.; 17;24.-1.5.; C.Buchbender;; 18;1.-8.5.; N.Billot;; 19;8.-15.5.; S.Trevino; SAC-Meeting 10./11.; 20;15.-22.5.; J.Abreu/M.Ruiz/G.Bruni; VLBI@3mm 17.-22.; 21;22.-29.5.; M.Gonzalez;; 22;29.-5.6.; A.Sievers; NIKA tests, Start of summer semester; 23;5.-12.6.; N.Billot/G.Bruni; A.Castets & Students visiting on 6.6.; 24;12.-19.6.; C.Buchbender; Fire Brigade Training 14.6.; 25;19.-26.6.; J.Abreu/G.Bruni; Evacuation Simulation 20.6.; 26;26.6.-3.7.; S.Trevino; 005-12, 050-12; |
|
| Line 33: | Line 18: |
| 38;18.-25.9.; I.Ruiz/E.Lobato (operators) ; Heavy Maintenance: Holo-Rx, Gearboxes;; 39;25.9.-2.10.;;;; 40;2.-9.10.;;;; 41;9.-16.10.;;;; 42;16.-23.10.;;;; 43;23.-30.10.;;;; 44; 30.-6.11.; C.Kramer; GISMO Pool Week I + EMIR backup; 45; 6.-13.11.; G.Bruni; GISMO Pool Week II + EMIR backup; 46; 13.-20.11.; N.Billot or A.Sievers; NIKA Installation; 47; 20.-27.11.; A.Sievers or N.Billot; NIKA Week 48; 27.11.-4.12.;;;; 49; 4.-11.12.;;;; |
38;18.-25.9.; I.Ruiz/E.Lobato (operators) ; Heavy Maintenance: Holo-Rx, Gearboxes; 39;25.9.-2.10.; S.Trevino;; 40;2.-9.10.; J.Abreu;; 41;9.-16.10.; S.Trevino; Heterodyne Pool Week; 42;16.-23.10.; M.Gonzalez/G.Bruni; Heterodyne Pool Week; 43;23.-30.10.; J.Abreu;; 44; 30.10.-6.11.; C.Kramer (30.10.-6.11.), M.Gonzalez (30.-2.11.); GISMO Pool Week I; 45; 6.-13.11.; N.Billot (5.-9.11.), G.Bruni (6.-13.11.); GISMO Pool Week II; 46; 13.-20.11.; A.Sievers; NIKA Installation; 47; 20.-27.11.; N.Billot; NIKA Week; 48; 27.11.-4.12.;;; 49; 4.-11.12.;;; |
| Line 50: | Line 35: |
| * AodSchedule112 | * AodSchedule112, AodSchedule212 |
