Differences between revisions 639 and 998 (spanning 359 versions)
Revision 639 as of 2012-05-29 11:27:45
Size: 1005
Editor: lt-ck
Comment:
Revision 998 as of 2016-11-23 08:49:12
Size: 714
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:

= 2017 =
Line 7: Line 9:
Week ; Dates ; AoD ; Comments;;
13;27.-3.4.; J.Abreu;;
14;3.-10.4.; S.Trevino; Semana Santa;
15;10.-17.4.; A.Sievers; GISMO Week I;
16;17.-24.4.; J.Abreu; GISMO Week II, PC-Meeting 24./25.;
17;24.-1.5.; C.Buchbender;;
18;1.-8.5.; N.Billot;;
19;8.-15.5.; S.Trevino; SAC-Meeting 10./11.;
20;15.-22.5.; J.Abreu/M.Ruiz/G.Bruni; VLBI@3mm 17.-22.;
21;22.-29.5.; M.Gonzalez;;
22;29.-5.6.; A.Sievers; NIKA tests, Start of summer semester;
23;5.-12.6.; N.Billot/G.Bruni; A.Castets & Students visiting on 6.6.;
24;12.-19.6.; C.Buchbender;;
25;19.-26.6.; J.Abreu/G.Bruni;;
26;26.6.-3.7.; S.Trevino;;
27;3.-10.7.; H.Ungerechts;;
28;10.-17.7.; M.Gonzalez;;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week, 4./5. 0.8mm VLBI 30m-NOEMA test slot;
2; 10.-17.1.; H.Ungerechts (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch to mrt-cal ?;
4; 24.-31.1.; P.Garcia; NIKA2 commissioning week ?;
5; 31.1.-7.2.;;;
Line 27: Line 17:
 * AodSchedule112  * AodSchedule16
 * AodSchedule15
 * AodSchedule14
 * AodSchedule13
 * AodSchedule112, AodSchedule212, AodSchedule3412

2017

1 3.-10.1. P.Torne Heterodyne Pool Week, 4./5. 0.8mm VLBI 30m-NOEMA test slot
2 10.-17.1. H.Ungerechts (remote from Granada)
3 17.-24.1. A.Sievers Switch to mrt-cal ?
4 24.-31.1. P.Garcia NIKA2 commissioning week ?
5 31.1.-7.2.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)