| Line 12: | Line 12: |
| 44;1.-8.11.; C.Buchbender; 2nd Pool week, EMIR Upgrade of E0 & E3 with new switchbox: 3.-10.11.; | 44;1.-8.11.; C.Buchbender; 2nd Pool week, EMIR Upgrade of E2 & E3 with new switchbox: 3.-10.11.; |
| Line 14: | Line 14: |
| 46;15.-22.11.; S.Trevino, M.Gonzalez (15.-18.11.), C.Kramer (18.-22.11.); 4th Pool week, EmirCommissioning, visit of D.Hughes 21.,22.11.; 47;22.-29.11.; J.Abreu; 5th Pool week, 24.11. 3mm-VLBI; |
46;15.-22.11.; S.Trevino, M.Gonzalez (15.-18.11.), C.Kramer (18.-22.11.); 4th Pool week, EmirCommissioning; 47;22.-29.11.; J.Abreu; 5th Pool week, 3mm-VLBI: 24.11.; |