Differences between revisions 577 and 1006 (spanning 429 versions)
Revision 577 as of 2011-10-16 12:15:18
Size: 2009
Editor: lt-ck
Comment:
Revision 1006 as of 2017-01-08 09:00:00
Size: 1279
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:

= 2017 =
Line 7: Line 9:
Week ; Dates ; AoD ; Comments;;
26.2;1.-5.7.; C.Buchbender;;
27;5.-12.7.; J.Abreu;;
28;12.-19.7.; A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue); 12.-14.7. 32GHz-FTS-System tests, additional support by N.Billot (Tue-Sun), G.Paubert;
29;19.-26.7.; C.Buchbender/S.Trevino (I);;
30;26.7.-2.8.; M.Gonzalez (Mon-Tue), N.Billot(Fri-Tue, I); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu);
31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); 32GHz FTS system is available to all;
32;9.-16.8.; M.Gonzalez (Tue-Fri), F.Damour/J.L.Santaren (oper.), A.Sievers (Fri-Tue), S.Trevino (Thu-Tue, II);
33;16.-23.8.; J.Abreu; (225-10 17.-19. C.Buchbender);
34;23.-30.8.; C.Buchbender/S.Trevino (III);
35;30.8.-6.9.; J.Santiago (day time op.);;
36;6.9.-13.9.; J.Abreu (6-9.9)/S.Trevino (IV); ;
37;13.9.-20.9.; J.Santiago (day time op.); Heavy Maintenance: Gearboxes, Computers, ...;
38;20.9.-27.9.; A.Sievers (F.Damour, night-time op.); Summerschool 23.-30.9. Fri-Fri;
39;27.9.-4.10.; G.Quintana-Lacaci (remotely from Granada)/ J.Abreu (30.9), F.Damour (night time op.); Summerschool till 30.9.;
40;4.10.-11.10.; J.Abreu; 3mm VLBI 6.-11.10.;
41;11.10.-18.10.; S.Trevino;;
42;18.10.-25.10.; A.Sievers; NIKA run;
43;25.10.-1.11.; J.Abreu; 1st Pool week ;
44;1.-8.11.; C.Buchbender; 2nd Pool week, EMIR Upgrade of E0 & E3 with new switchbox: 3.-10.11.;
45;8.-15.11.; G.Paubert; 3rd Pool week, EmirCommissioning: 10.-15.11.;
46;15.-22.11.; M.Gonzalez/S.Trevino; 4th Pool week (+EmirCommissioning);
47;22.-29.11.; J.Abreu; 5th Pool week, End of Summersemester 2011;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week;
2; 10.-17.1.; G.Paubert (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch from mira to met-cal, 20.1.: 0.8mm VLBI test slot;
4; 24.-31.1.; P.Garcia; NIKA2 commissioning week, 1mm VLBI test slots ??;
5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, 1mm VLBI test slots ??;
6; 7.-14.2.; H.Ungerechts (remote from Granada);;
7; 14.-21.2.;;;
8; 21.-28.2.;;;
9; 28.2.-7.3.;;;
10; 7.-14.3.;; 11.-13.3. A.Maury+Students;
11; 14.-21.3.;; 16.3. IRAM Proposal Deadline;
12; 21.28.3.;;;
13; 28.3.-4.4.;; 30.3.-4.4. VLBI/GMVA 3mm Session;
14; 4.-11.4.;; 5.-14.4.: VLBI/EHT 1mm Session mixed with non-VLBI programs;
15; 11.-18.4.;;;
16; 18.-25.4.;;;
17; 25.4.-2.5.;;;
18; 2.-9.5.;;;
19; 9.-16.5.;;;
20; 16.-23.5.;;;
21; 23.-30.5.;; End of winter semester W16;
Line 33: Line 33:
 * AodSchedule111, AodSchedule211  * AodSchedule16
 * AodSchedule15
 * AodSchedule14
 * AodSchedule13
 * AodSchedule112, AodSchedule212, AodSchedule3412
 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111

2017

1 3.-10.1. P.Torne Heterodyne Pool Week
2 10.-17.1. G.Paubert (remote from Granada)
3 17.-24.1. A.Sievers Switch from mira to met-cal, 20.1.: 0.8mm VLBI test slot
4 24.-31.1. P.Garcia NIKA2 commissioning week, 1mm VLBI test slots ??
5 31.1.-7.2. C.Marka Heterodyne Pool Week #2, 1mm VLBI test slots ??
6 7.-14.2. H.Ungerechts (remote from Granada)
7 14.-21.2.
8 21.-28.2.
9 28.2.-7.3.
10 7.-14.3. 11.-13.3. A.Maury+Students
11 14.-21.3. 16.3. IRAM Proposal Deadline
12 21.28.3.
13 28.3.-4.4. 30.3.-4.4. VLBI/GMVA 3mm Session
14 4.-11.4. 5.-14.4.: VLBI/EHT 1mm Session mixed with non-VLBI programs
15 11.-18.4.
16 18.-25.4.
17 25.4.-2.5.
18 2.-9.5.
19 9.-16.5.
20 16.-23.5.
21 23.-30.5. End of winter semester W16

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)