Size: 1822
Comment:
|
Size: 1947
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
30;26.7.-2.8.; M.Gonzalez (Mon-Tue), N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu); | 30;26.7.-2.8.; M.Gonzalez (Mon-Tue), N.Billot(Fri-Tue, I); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu); |
Line 14: | Line 14: |
32;9.-16.8.; M.Gonzalez/S.Trevino (II); | 32;9.-16.8.; M.Gonzalez (Tue-Fri), F.Damour/J.L.Santaren (oper.), A.Sievers (Fri-Tue), S.Trevino (Thu-Tue, II); |
Line 17: | Line 17: |
35;30.8.-6.9.; M.Gonzalez, J.Santiago (day time op.);; 36;6.9.-13.9.; J.Abreu/S.Trevino (IV);; |
35;30.8.-6.9.; J.Santiago (day time op.);; 36;6.9.-13.9.; J.Abreu (6-9.9)/S.Trevino (IV);; |
Line 20: | Line 20: |
38;20.9.-27.9.; A.Sievers; Summerschool 23.-30.9. Fri-Fri; | 38;20.9.-27.9.; A.Sievers (F.Damour, night-time op.); Summerschool 23.-30.9. Fri-Fri; |
Line 28: | Line 28: |
46;15.-22.11.; M.Gonzalez; Heterodyne Pool; | 46;15.-22.11.; M.Gonzalez/S.Trevino; Heterodyne Pool (+Commissioning); |