Size: 1794
Comment:
|
Size: 1852
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
30;26.7.-2.8.; M.Gonzalez (Mon-Tue), N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu); | 30;26.7.-2.8.; M.Gonzalez (Mon-Tue), N.Billot(Fri-Tue, I); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu); |
Line 28: | Line 28: |
46;15.-22.11.; M.Gonzalez; Heterodyne Pool; 47;22.-29.11.; J.Abreu; Heterodyne Pool; |
46;15.-22.11.; M.Gonzalez/S.Trevino; Heterodyne Pool (+Commissioning); 47;22.-29.11.; J.Abreu; Heterodyne Pool, End of Summersemester 2011; |