|
Size: 1766
Comment:
|
Size: 1511
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 7: | Line 7: |
| Week ; Dates ; AoD ; Comments;; 26.2;1.-5.7.; C.Buchbender;; 27;5.-12.7.; J.Abreu;; 28;12.-19.7.; A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue); 12.-14.7. 32GHz-FTS-System tests, additional support by N.Billot (Tue-Sun), G.Paubert; 29;19.-26.7.; C.Buchbender/S.Trevino;; 30;26.7.-2.8.; M.Gonzalez (Mon-Fri), A.Sievers (Fri-Tue)/N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu); 31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); plan: FTS is available again to all observers; 32;9.-16.8.; M.Gonzalez/S.Trevino; 33;16.-23.8.; J.Abreu; (225-10 17.-19. C.Buchbender); 34;23.-30.8.; C.Buchbender/S.Trevino; 35;30.8.-6.9.; J.Santiago (day time op.);; 36;6.9.-13.9.; J.Abreu/S.Trevino;; 37;13.9.-20.9.; J.Santiago (day time op.); Heavy Maintenance: Gearboxes, Computers, ...; 38;20.9.-27.9.; A.Sievers/S.Trevino; Summerschool 23.-30.9. Fri-Fri; 39;27.9.-4.10.; G.Quintana-Lacaci (remotely from Granada), F.Damour (night time op.); Summerschool till 30.9.; 40;4.10.-11.10.; M.Ruiz; 3mm VLBI 6.-11.10.; 41;11.10.-18.10.; S.Trevino;; 42;18.10.-25.10.; A.Sievers; NIKA run; 43;25.10.-1.11.; J.Abreu;; 44;1.-8.11.; S.Trevino; EMIR Upgrade of E0 & E3 with new switchbox: 3.-10.11.; 45;8.-15.11.; M.Gonzalez; EMIR Commissioning: 10.-15.11.; 46;15.-22.11.; G.Paubert;; 47;22.-29.11.; J.Abreu;; |
1; 30.12.-6.1.; I.Hermelo;; 2; 6.-13.1.; C.Marka; Heterodyne Pool ; 3; 13.-20.1.; G.Paubert; Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?); 4; 20.-27.1.; M.Ruiz & I.Ruiz (operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.); 5; 27.1.-3.2.; N.Billot; NIKA Pool; 6; 3.-10.2.; I.Hermelo; NIKA Pool; 7; 10.-17.2.; A.Sievers; NIKA Polarimetry test run; 8; 17.-24.2.; N.Billot;; 9; 24.2.-3.3.; I.Hermelo; GISMO Pool; 10; 3.-10.3.; G.Paubert; Pulsar observations; 11; 10.-17.3.; C.Marka; IRAM Deadline on 12-Mar; 12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI); 13; 24.-31.3.; C.Marka; Heterodyne Pool(flexible 1mm VLBI); 14; 31.3.-7.4.; H.Ungerechts (from Granada);; 15; 7.-14.4.; G.Paubert (from Granada); Installation of new optics; 16; 14.-21.4.; A.Sievers; Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.); 17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations; 18; 28.4.-5.5.; I. Hermelo;; 19; 5.-12.5.; N.Billot;; 20; 12.-19.5.; ;; 21; 19.-26.5.; ;; 22; 26.5.-2.6.; ;; |
| Line 33: | Line 32: |
| * AodSchedule111, AodSchedule211 | * AodSchedule14 * AodSchedule13 * AodSchedule112, AodSchedule212, AodSchedule3412 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111 |
Old AoD Plans:
