|
Size: 1766
Comment:
|
Size: 1965
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 11: | Line 11: |
| 29;19.-26.7.; C.Buchbender/S.Trevino;; 30;26.7.-2.8.; M.Gonzalez (Mon-Fri), A.Sievers (Fri-Tue)/N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu); 31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); plan: FTS is available again to all observers; 32;9.-16.8.; M.Gonzalez/S.Trevino; |
29;19.-26.7.; C.Buchbender/S.Trevino (I);; 30;26.7.-2.8.; M.Gonzalez (Mon-Tue), N.Billot(Fri-Tue, I); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu); 31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); 32GHz FTS system is available to all; 32;9.-16.8.; M.Gonzalez (Tue-Fri), F.Damour/J.L.Santaren (oper.), A.Sievers (Fri-Tue), S.Trevino (Thu-Tue, II); |
| Line 16: | Line 16: |
| 34;23.-30.8.; C.Buchbender/S.Trevino; | 34;23.-30.8.; C.Buchbender/S.Trevino (III); |
| Line 18: | Line 18: |
| 36;6.9.-13.9.; J.Abreu/S.Trevino;; | 36;6.9.-13.9.; J.Abreu (6-9.9)/S.Trevino (IV); ; |
| Line 20: | Line 20: |
| 38;20.9.-27.9.; A.Sievers/S.Trevino; Summerschool 23.-30.9. Fri-Fri; 39;27.9.-4.10.; G.Quintana-Lacaci (remotely from Granada), F.Damour (night time op.); Summerschool till 30.9.; 40;4.10.-11.10.; M.Ruiz; 3mm VLBI 6.-11.10.; |
38;20.9.-27.9.; A.Sievers (F.Damour, night-time op.); Summerschool 23.-30.9. Fri-Fri; 39;27.9.-4.10.; G.Quintana-Lacaci (remotely from Granada)/ J.Abreu (30.9), F.Damour (night time op.); Summerschool till 30.9.; 40;4.10.-11.10.; J.Abreu; 3mm VLBI 6.-11.10.; |
| Line 26: | Line 26: |
| 44;1.-8.11.; S.Trevino; EMIR Upgrade of E0 & E3 with new switchbox: 3.-10.11.; 45;8.-15.11.; M.Gonzalez; EMIR Commissioning: 10.-15.11.; 46;15.-22.11.; G.Paubert;; 47;22.-29.11.; J.Abreu;; |
44;1.-8.11.; C.Buchbender; EMIR Upgrade of E0 & E3 with new switchbox: 3.-10.11.; 45;8.-15.11.; G.Paubert; EMIR Commissioning: 10.-15.11.; 46;15.-22.11.; M.Gonzalez/S.Trevino; Heterodyne Pool (+Commissioning); 47;22.-29.11.; J.Abreu; Heterodyne Pool, End of Summersemester 2011; |
