Differences between revisions 553 and 555 (spanning 2 versions)
Revision 553 as of 2011-07-28 16:14:42
Size: 1766
Editor: mrt-lx9
Comment:
Revision 555 as of 2011-07-28 16:18:43
Size: 1737
Editor: mrt-lx9
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
30;26.7.-2.8.; M.Gonzalez (Mon-Fri), A.Sievers (Fri-Tue)/N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu);
31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); plan: FTS is available again to all observers;
30;26.7.-2.8.; M.Gonzalez (Mon-Tue), N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu);
31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); 32GHz FTS system is available to all;

Week Dates AoD Comments
26.2 1.-5.7. C.Buchbender
27 5.-12.7. J.Abreu
28 12.-19.7. A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue) 12.-14.7. 32GHz-FTS-System tests, additional support by N.Billot (Tue-Sun), G.Paubert
29 19.-26.7. C.Buchbender/S.Trevino
30 26.7.-2.8. M.Gonzalez (Mon-Tue), N.Billot(Fri-Tue) 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu)
31 2.-9.8. C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.) 32GHz FTS system is available to all
32 9.-16.8. M.Gonzalez/S.Trevino
33 16.-23.8. J.Abreu (225-10 17.-19. C.Buchbender)
34 23.-30.8. C.Buchbender/S.Trevino
35 30.8.-6.9. J.Santiago (day time op.)
36 6.9.-13.9. J.Abreu/S.Trevino
37 13.9.-20.9. J.Santiago (day time op.) Heavy Maintenance: Gearboxes, Computers, ...
38 20.9.-27.9. A.Sievers/S.Trevino Summerschool 23.-30.9. Fri-Fri
39 27.9.-4.10. G.Quintana-Lacaci (remotely from Granada), F.Damour (night time op.) Summerschool till 30.9.
40 4.10.-11.10. M.Ruiz 3mm VLBI 6.-11.10.
41 11.10.-18.10. S.Trevino
42 18.10.-25.10. A.Sievers NIKA run
43 25.10.-1.11. J.Abreu
44 1.-8.11. S.Trevino EMIR Upgrade of E0 & E3 with new switchbox: 3.-10.11.
45 8.-15.11. M.Gonzalez EMIR Commissioning: 10.-15.11.
46 15.-22.11. G.Paubert
47 22.-29.11. J.Abreu

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)