Differences between revisions 55 and 90 (spanning 35 versions)
Revision 55 as of 2006-09-05 12:27:09
Size: 966
Editor: visitor5
Comment:
Revision 90 as of 2007-10-04 11:47:45
Size: 491
Editor: visitor9
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:


Line 8: Line 5:
27; 4.7.-11.7.;Martin (Tue-Fri), Sievers (Fri-Tue) ;
28; 11.7.-18.7.;Ruiz; AoD can be contacted during his day shift
29; 18.7.-25.7.;Marcelino;
30; 25.7.-1.8.;Ungerechts (Tue-Fri), Ruiz (Fri-Tue); Ruiz can be contacted during his night shift
31; 1.8.-8.8.;Marcelino;
32; 8.8.-15.8.;Sievers (Tue-Sun) Martin (Sun-Tue);
33; 15.8.-22.8.;Ocana;
34; 22.8.-29.8.;Marcelino ;
35; 29.8.-5.9.;Martin (Tue-Fri) Ocana (Fri-Tue);
36; 5.9.-12.9.;Leon;
37; 12.9.-19.9.;Ocana (Tue-Mon); 18./19.9.: heavy maintenance
38; 19.9.-26.9.;Marcelino (Wed-Fri) Ungerechts (Fri-Tue); heavy maintenance till 20.9. afternoon
39; 26.9.-3.10.;Paubert; FX tests;
40; 3.10.-10.10.;Leon; Mambo pool;
41; 10.10.-17.10.;Leon(Tue-Wed), MRuiz (Wed-Tue); Mambo Pool (Tue-Wed), VLBI (Thu-Tue);
42; 17.10.-24.10.; MRuiz (Tue-Wed), Ocana (Thu-Tue);
43; 24.10.-31.10.; Wiesemeyer; HERA Pool;
}}}
40;2.10.-9.10.;Ocana; MAMBO pool
41;9.10.-16.10.; Ruiz; VLBI
42;16.10.-23.10.;Aladro (Tue-Fri);
43;23.10.-30.10.;;HERA Pool
44;30.10.-6.11.;; GIZMO Installation & HERA Pool
45;6.11.-13.11.;;GIZMO PI Observing, AoD will be available in Granada
46;13.11.-20.11.;Leon; MAMBO Pool
47;20.11.-27.11.;;
48;27.11.-4.12.;;
49;4.12.-11.12.;;
50;11.12.-18.12.;;
51;18.12.-25.12.;;
52;25.12.-1.1.07;;}}}

Week Dates AoD Comments
40 2.10.-9.10. Ocana MAMBO pool
41 9.10.-16.10. Ruiz VLBI
42 16.10.-23.10. Aladro (Tue-Fri)
43 23.10.-30.10. HERA Pool
44 30.10.-6.11. GIZMO Installation & HERA Pool
45 6.11.-13.11. GIZMO PI Observing, AoD will be available in Granada
46 13.11.-20.11. Leon MAMBO Pool
47 20.11.-27.11.
48 27.11.-4.12.
49 4.12.-11.12.
50 11.12.-18.12.
51 18.12.-25.12.
52 25.12.-1.1.07

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)