Differences between revisions 546 and 555 (spanning 9 versions)
Revision 546 as of 2011-07-28 16:00:52
Size: 2195
Editor: mrt-lx9
Comment:
Revision 555 as of 2011-07-28 16:18:43
Size: 1737
Editor: mrt-lx9
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
14;5.4.-12.4.;J.Abreu;;
15;12.4.-19.4.;G.Quintana-Lacaci; GISMO 4th test run;
16;19.-26.4.;C.Buchbender;Semana Santa;
17;26.4.-3.5.;M.Gonzalez; ;
18;3.-10.5.;D.Riquelme (3.-5.5.), M.Ruiz; VLBI@3mm;
19;10.-17.5.;J.Abreu; ;
20;17.-24.5.;C.Buchbender; ;
21;24.-31.5.;G.Paubert;;
22;31.5.-7.6.;J.Abreu; (Toledo conference 30.5.-3.6.);
23;7.-14.6.;D.Riquelme; 228-09;
24;14.-21.6.;C.Buchbender and J.Abreu (17-21.6);;
25;21.-28.6.;G.Quintana-Lacaci (remotely), F.Damour (night-time op.);;
26.1;27.6.-1.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests;
Line 25: Line 12:
30;26.7.-2.8.; M.Gonzalez (Mon-Fri), A.Sievers (Fri-Tue)/N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu);
31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); plan: FTS is available again to all observers;
30;26.7.-2.8.; M.Gonzalez (Mon-Tue), N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu);
31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); 32GHz FTS system is available to all;
Line 33: Line 20:
38;20.9.-27.9.; A.Sievers; Summerschool 23.-30.9. Fri-Fri;
39;27.9.-4.10.; ???; Summerschool till 30.9.;
38;20.9.-27.9.; A.Sievers/S.Trevino; Summerschool 23.-30.9. Fri-Fri;
39;27.9.-4.10.; G.Quintana-Lacaci (remotely from Granada), F.Damour (night time op.); Summerschool till 30.9.;
Line 36: Line 23:
41;11.10.-18.10.; ???;; 41;11.10.-18.10.; S.Trevino;;
Line 39: Line 26:
44;1.-8.11.; ???; EMIR Upgrade: 3.-10.11.;
45;8.-15.11.; ???; EMIR Commissioning: 10.-15.11.;
46;15.-22.11.;;;
47;22.-29.11.;;;
44;1.-8.11.; S.Trevino; EMIR Upgrade of E0 & E3 with new switchbox: 3.-10.11.;
45;8.-15.11.; M.Gonzalez; EMIR Commissioning: 10.-15.11.;
46;15.-22.11.; G.Paubert;;
47;22.-29.11.; J.Abreu;;
Line 46: Line 33:
 * AodSchedule111  * AodSchedule111, AodSchedule211

Week Dates AoD Comments
26.2 1.-5.7. C.Buchbender
27 5.-12.7. J.Abreu
28 12.-19.7. A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue) 12.-14.7. 32GHz-FTS-System tests, additional support by N.Billot (Tue-Sun), G.Paubert
29 19.-26.7. C.Buchbender/S.Trevino
30 26.7.-2.8. M.Gonzalez (Mon-Tue), N.Billot(Fri-Tue) 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu)
31 2.-9.8. C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.) 32GHz FTS system is available to all
32 9.-16.8. M.Gonzalez/S.Trevino
33 16.-23.8. J.Abreu (225-10 17.-19. C.Buchbender)
34 23.-30.8. C.Buchbender/S.Trevino
35 30.8.-6.9. J.Santiago (day time op.)
36 6.9.-13.9. J.Abreu/S.Trevino
37 13.9.-20.9. J.Santiago (day time op.) Heavy Maintenance: Gearboxes, Computers, ...
38 20.9.-27.9. A.Sievers/S.Trevino Summerschool 23.-30.9. Fri-Fri
39 27.9.-4.10. G.Quintana-Lacaci (remotely from Granada), F.Damour (night time op.) Summerschool till 30.9.
40 4.10.-11.10. M.Ruiz 3mm VLBI 6.-11.10.
41 11.10.-18.10. S.Trevino
42 18.10.-25.10. A.Sievers NIKA run
43 25.10.-1.11. J.Abreu
44 1.-8.11. S.Trevino EMIR Upgrade of E0 & E3 with new switchbox: 3.-10.11.
45 8.-15.11. M.Gonzalez EMIR Commissioning: 10.-15.11.
46 15.-22.11. G.Paubert
47 22.-29.11. J.Abreu

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)