2195
Comment:
|
1737
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
14;5.4.-12.4.;J.Abreu;; 15;12.4.-19.4.;G.Quintana-Lacaci; GISMO 4th test run; 16;19.-26.4.;C.Buchbender;Semana Santa; 17;26.4.-3.5.;M.Gonzalez; ; 18;3.-10.5.;D.Riquelme (3.-5.5.), M.Ruiz; VLBI@3mm; 19;10.-17.5.;J.Abreu; ; 20;17.-24.5.;C.Buchbender; ; 21;24.-31.5.;G.Paubert;; 22;31.5.-7.6.;J.Abreu; (Toledo conference 30.5.-3.6.); 23;7.-14.6.;D.Riquelme; 228-09; 24;14.-21.6.;C.Buchbender and J.Abreu (17-21.6);; 25;21.-28.6.;G.Quintana-Lacaci (remotely), F.Damour (night-time op.);; 26.1;27.6.-1.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests; |
|
Line 25: | Line 12: |
30;26.7.-2.8.; M.Gonzalez (Mon-Fri), A.Sievers (Fri-Tue)/N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu); 31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); plan: FTS is available again to all observers; |
30;26.7.-2.8.; M.Gonzalez (Mon-Tue), N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu); 31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); 32GHz FTS system is available to all; |
Line 33: | Line 20: |
38;20.9.-27.9.; A.Sievers; Summerschool 23.-30.9. Fri-Fri; 39;27.9.-4.10.; ???; Summerschool till 30.9.; |
38;20.9.-27.9.; A.Sievers/S.Trevino; Summerschool 23.-30.9. Fri-Fri; 39;27.9.-4.10.; G.Quintana-Lacaci (remotely from Granada), F.Damour (night time op.); Summerschool till 30.9.; |
Line 36: | Line 23: |
41;11.10.-18.10.; ???;; | 41;11.10.-18.10.; S.Trevino;; |
Line 39: | Line 26: |
44;1.-8.11.; ???; EMIR Upgrade: 3.-10.11.; 45;8.-15.11.; ???; EMIR Commissioning: 10.-15.11.; 46;15.-22.11.;;; 47;22.-29.11.;;; |
44;1.-8.11.; S.Trevino; EMIR Upgrade of E0 & E3 with new switchbox: 3.-10.11.; 45;8.-15.11.; M.Gonzalez; EMIR Commissioning: 10.-15.11.; 46;15.-22.11.; G.Paubert;; 47;22.-29.11.; J.Abreu;; |
Line 46: | Line 33: |
* AodSchedule111 | * AodSchedule111, AodSchedule211 |