Differences between revisions 546 and 1023 (spanning 477 versions)
Revision 546 as of 2011-07-28 16:00:52
Size: 2195
Editor: mrt-lx9
Comment:
Revision 1023 as of 2017-01-12 07:56:04
Size: 1616
Editor: PabloMellado
Comment: Notifications are not working
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
##language:en ## page was renamed from AstronomerOnDutySchedule
#language:en
Line 3: Line 4:

= 2017 =
Line 7: Line 10:
Week ; Dates ; AoD ; Comments;;
14;5.4.-12.4.;J.Abreu;;
15;12.4.-19.4.;G.Quintana-Lacaci; GISMO 4th test run;
16;19.-26.4.;C.Buchbender;Semana Santa;
17;26.4.-3.5.;M.Gonzalez; ;
18;3.-10.5.;D.Riquelme (3.-5.5.), M.Ruiz; VLBI@3mm;
19;10.-17.5.;J.Abreu; ;
20;17.-24.5.;C.Buchbender; ;
21;24.-31.5.;G.Paubert;;
22;31.5.-7.6.;J.Abreu; (Toledo conference 30.5.-3.6.);
23;7.-14.6.;D.Riquelme; 228-09;
24;14.-21.6.;C.Buchbender and J.Abreu (17-21.6);;
25;21.-28.6.;G.Quintana-Lacaci (remotely), F.Damour (night-time op.);;
26.1;27.6.-1.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests;
26.2;1.-5.7.; C.Buchbender;;
27;5.-12.7.; J.Abreu;;
28;12.-19.7.; A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue); 12.-14.7. 32GHz-FTS-System tests, additional support by N.Billot (Tue-Sun), G.Paubert;
29;19.-26.7.; C.Buchbender/S.Trevino;;
30;26.7.-2.8.; M.Gonzalez (Mon-Fri), A.Sievers (Fri-Tue)/N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu);
31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); plan: FTS is available again to all observers;
32;9.-16.8.; M.Gonzalez/S.Trevino;
33;16.-23.8.; J.Abreu; (225-10 17.-19. C.Buchbender);
34;23.-30.8.; C.Buchbender/S.Trevino;
35;30.8.-6.9.; J.Santiago (day time op.);;
36;6.9.-13.9.; J.Abreu/S.Trevino;;
37;13.9.-20.9.; J.Santiago (day time op.); Heavy Maintenance: Gearboxes, Computers, ...;
38;20.9.-27.9.; A.Sievers; Summerschool 23.-30.9. Fri-Fri;
39;27.9.-4.10.; ???; Summerschool till 30.9.;
40;4.10.-11.10.; M.Ruiz; 3mm VLBI 6.-11.10.;
41;11.10.-18.10.; ???;;
42;18.10.-25.10.; A.Sievers; NIKA run;
43;25.10.-1.11.; J.Abreu;;
44;1.-8.11.; ???; EMIR Upgrade: 3.-10.11.;
45;8.-15.11.; ???; EMIR Commissioning: 10.-15.11.;
46;15.-22.11.;;;
47;22.-29.11.;;;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week;
2; 10.-17.1.; G.Paubert (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot;
4; 24.-31.1.; P.Garcia; 6hours NIKA2 slot, possible 4hours 1mm VLBI slots;
5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot;
6; 7.-14.2.; H.Ungerechts (remote from Granada); 10.2.: 0.8mm VLBI test slot;
7; 14.-21.2.; P.Torne; 15.2.: 0.8mm VLBI test slot;
8; 21.-28.2.; P.Garcia / A.Ritacco; NIKA2 commissioning week;
9; 28.2.-7.3.;G.Paubert (remote from Granada);;
10; 7.-14.3.;C.Marka/ A.Ritacco; 11.-13.3. A.Maury+Students;
11; 14.-21.3.;A.Sievers (remote from Granada); 16.3. IRAM Proposal Deadline;
12; 21.-28.3.;P.Garcia;;
13; 28.3.-4.4.; P.Torne; 30.3.-4.4. VLBI/GMVA 3mm Session;
14; 4.-11.4.; C.Marka / A.Ritacco; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
15; 11.-18.4.; P.Torne; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
16; 18.-25.4.;;;
17; 25.4.-2.5.;;;
18; 2.-9.5.;;;
19; 9.-16.5.;;;
20; 16.-23.5.;;;
21; 23.-30.5.;; End of winter semester W16;
22; 30.5.-6.6.;;;
Line 46: Line 35:
 * AodSchedule111  * AodSchedule16
 * AodSchedule15
 * AodSchedule14
 * AodSchedule13
 * AodSchedule112, AodSchedule212, AodSchedule3412
 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111

2017

1 3.-10.1. P.Torne Heterodyne Pool Week
2 10.-17.1. G.Paubert (remote from Granada)
3 17.-24.1. A.Sievers Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot
4 24.-31.1. P.Garcia 6hours NIKA2 slot, possible 4hours 1mm VLBI slots
5 31.1.-7.2. C.Marka Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot
6 7.-14.2. H.Ungerechts (remote from Granada) 10.2.: 0.8mm VLBI test slot
7 14.-21.2. P.Torne 15.2.: 0.8mm VLBI test slot
8 21.-28.2. P.Garcia / A.Ritacco NIKA2 commissioning week
9 28.2.-7.3. G.Paubert (remote from Granada)
10 7.-14.3. C.Marka/ A.Ritacco 11.-13.3. A.Maury+Students
11 14.-21.3. A.Sievers (remote from Granada) 16.3. IRAM Proposal Deadline
12 21.-28.3. P.Garcia
13 28.3.-4.4. P.Torne 30.3.-4.4. VLBI/GMVA 3mm Session
14 4.-11.4. C.Marka / A.Ritacco 5.-14.4.: VLBI/EHT 1mm Session and Pool
15 11.-18.4. P.Torne 5.-14.4.: VLBI/EHT 1mm Session and Pool
16 18.-25.4.
17 25.4.-2.5.
18 2.-9.5.
19 9.-16.5.
20 16.-23.5.
21 23.-30.5. End of winter semester W16
22 30.5.-6.6.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)