Differences between revisions 544 and 584 (spanning 40 versions)
Revision 544 as of 2011-07-28 15:56:03
Size: 2143
Editor: mrt-lx9
Comment:
Revision 584 as of 2011-10-27 07:44:15
Size: 1033
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
14;5.4.-12.4.;J.Abreu;;
15;12.4.-19.4.;G.Quintana-Lacaci; GISMO 4th test run;
16;19.-26.4.;C.Buchbender;Semana Santa;
17;26.4.-3.5.;M.Gonzalez; ;
18;3.-10.5.;D.Riquelme (3.-5.5.), M.Ruiz; VLBI@3mm;
19;10.-17.5.;J.Abreu; ;
20;17.-24.5.;C.Buchbender; ;
21;24.-31.5.;G.Paubert;;
22;31.5.-7.6.;J.Abreu; (Toledo conference 30.5.-3.6.);
23;7.-14.6.;D.Riquelme; 228-09;
24;14.-21.6.;C.Buchbender and J.Abreu (17-21.6);;
25;21.-28.6.;G.Quintana-Lacaci (remotely), F.Damour (night-time op.);;
26.1;27.6.-1.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests;
26.2;1.-5.7.; C.Buchbender;;
27;5.-12.7.; J.Abreu;;
28;12.-19.7.; A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue); 12.-14.7. 32GHz-FTS-System tests, additional support by N.Billot (Tue-Sun), G.Paubert;
29;19.-26.7.; C.Buchbender/S.Trevino;;
30;26.7.-2.8.; M.Gonzalez (Mon-Fri), A.Sievers (Fri-Tue)/N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu);
31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); plan: FTS is available again to all observers;
32;9.-16.8.; M.Gonzalez/S.Trevino;
33;16.-23.8.; J.Abreu; (225-10 17.-19. C.Buchbender);
34;23.-30.8.; C.Buchbender/S.Trevino;
35;30.8.-6.9.;;;
36;6.9.-13.9.; J.Abreu/S.Trevino;;
37;13.9.-20.9.; J.Santiago (day time op.); Heavy Maintenance: Gearboxes, Computers, ...;
38;20.9.-27.9.;; Summerschool 23.-30.9. Fri-Fri;
39;27.9.-4.10.;; Summerschool till 30.9.;
40;4.10.-11.10.; M.Ruiz; 3mm VLBI 6.-11.10.;
41;11.10.-18.10.;;;
40;4.10.-11.10.; J.Abreu; 3mm VLBI 6.-11.10.;
41;11.10.-18.10.; S.Trevino;;
Line 38: Line 11:
43;25.10.-1.11.; J.Abreu;;
44;1.-8.11.;; EMIR Upgrade: 3.-10.11.;
45;8.-15.11.;; EMIR Commissioning: 10.-15.11.;
46;15.-22.11.;;;
47;22.-29.11.;;;
43;25.10.-1.11.; J.Abreu; 1st Pool week ;
44;1.-8.11.; C.Buchbender; 2nd Pool week, EMIR Upgrade of E0 & E3 with new switchbox: 3.-10.11.;
45;8.-15.11.; G.Paubert; 3rd Pool week, EmirCommissioning: 10.-15.11.;
46;15.-22.11.; S.Trevino, M.Gonzalez (15.-18.11.), C.Kramer (18.-22.11.); 4th Pool week, EmirCommissioning, visit of D.Hughes 21.,22.11.;
47;22.-29.11.; J.Abreu; 5th Pool week, End of Summersemester 2011;
48;29.11.-6.12.; XXX/N.Billot;;
49;6.-13.12.; (J.Santiago/F.Damour);;
50;13.-20.12.; (J.Santiago);;
51;20.-27.12.;;;
52;27.12.-3.1.2012;;;
53;;;;
Line 46: Line 25:
 * AodSchedule111  * AodSchedule111, AodSchedule211, AodSchedule311

Week Dates AoD Comments
40 4.10.-11.10. J.Abreu 3mm VLBI 6.-11.10.
41 11.10.-18.10. S.Trevino
42 18.10.-25.10. A.Sievers NIKA run
43 25.10.-1.11. J.Abreu 1st Pool week
44 1.-8.11. C.Buchbender 2nd Pool week, EMIR Upgrade of E0 & E3 with new switchbox: 3.-10.11.
45 8.-15.11. G.Paubert 3rd Pool week, EmirCommissioning: 10.-15.11.
46 15.-22.11. S.Trevino, M.Gonzalez (15.-18.11.), C.Kramer (18.-22.11.) 4th Pool week, EmirCommissioning, visit of D.Hughes 21.,22.11.
47 22.-29.11. J.Abreu 5th Pool week, End of Summersemester 2011
48 29.11.-6.12. XXX/N.Billot
49 6.-13.12. (J.Santiago/F.Damour)
50 13.-20.12. (J.Santiago)
51 20.-27.12.
52 27.12.-3.1.2012
53

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)