Line 23: Line 23:
28;12.-19.7.; A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue), N.Billot; 12.-14.7. 32GHz-FTS-System tests; 28;12.-19.7.; A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue), N.Billot (Tue-Sun); 12.-14.7. 32GHz-FTS-System tests;
Line 25: Line 25:
30;26.7.-2.8.; M.Gonzalez (Tue-Fri), A.Sievers (Fri-Tue), N.Billot; 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning; 30;26.7.-2.8.; M.Gonzalez (Mon-Fri), A.Sievers (Fri-Tue), N.Billot (Mon-Fri); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning;

Week Dates AoD Comments
14 5.4.-12.4. J.Abreu
15 12.4.-19.4. G.Quintana-Lacaci GISMO 4th test run
16 19.-26.4. C.Buchbender Semana Santa
17 26.4.-3.5. M.Gonzalez
18 3.-10.5. D.Riquelme (3.-5.5.), M.Ruiz VLBI@3mm
19 10.-17.5. J.Abreu
20 17.-24.5. C.Buchbender
21 24.-31.5. G.Paubert
22 31.5.-7.6. J.Abreu (Toledo conference 30.5.-3.6.)
23 7.-14.6. D.Riquelme 228-09
24 14.-21.6. C.Buchbender and J.Abreu (17-21.6)
25 21.-28.6. G.Quintana-Lacaci (remotely), F.Damour (night-time op.)
26.1 27.6.-1.7. G.Paubert 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests
26.2 1.-5.7. C.Buchbender
27 5.-12.7. J.Abreu
28 12.-19.7. A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue), N.Billot (Tue-Sun) 12.-14.7. 32GHz-FTS-System tests
29 19.-26.7. C.Buchbender
30 26.7.-2.8. M.Gonzalez (Mon-Fri), A.Sievers (Fri-Tue), N.Billot (Mon-Fri) 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning
31/1 2.-9.8. C.Buchbender plan: FTS is available again to all observers
31/2 5.-9.8. G.Quintana-Lacaci (remotely), F.Damour (day-time op.)
32 9.-16.8. M.Gonzalez/S.Morales
33 16.-23.8. J.Abreu (225-10 17.-19. CB)
34 23.-30.8. C.Buchbender