Differences between revisions 518 and 519
Revision 518 as of 2011-05-24 13:24:54
Size: 1254
Editor: lt-ck
Comment:
Revision 519 as of 2011-06-07 15:47:56
Size: 1287
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
26;28.6.-5.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests; 26.1;27.6.-1.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests;
26.2;1.-5.7.; C.Buchbender?;;

Week Dates AoD Comments
14 5.4.-12.4. J.Abreu
15 12.4.-19.4. G.Quintana-Lacaci GISMO 4th test run
16 19.-26.4. C.Buchbender Semana Santa
17 26.4.-3.5. M.Gonzalez
18 3.-10.5. D.Riquelme (3.-5.5.), M.Ruiz VLBI@3mm
19 10.-17.5. J.Abreu
20 17.-24.5. C.Buchbender
21 24.-31.5. G.Paubert
22 31.5.-7.6. J.Abreu (Toledo conference 30.5.-3.6.)
23 7.-14.6. D.Riquelme 228-09
24 14.-21.6. C.Buchbender
25 21.-28.6. G.Quintana-Lacaci (remotely), F.Damour (night-time op.)
26.1 27.6.-1.7. G.Paubert 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests
26.2 1.-5.7. C.Buchbender?
27 5.-12.7. J.Abreu/S.Morales
28 12.-19.7. M.Gonzalez/N.Billot 12.-14.7. 32GHz-FTS-System commissioning
29 19.-26.7. C.Buchbender/S.Morales
30 26.7.-2.8. A.Sievers/N.Billot 25.-28.7. TT-NCS 32GHz-FTS-System
31 2.-9.8. F.Damour (day-time op.), G.Quintana-Lacaci (remotely)
32 9.-16.8. M.Gonzalez/S.Morales
33 16.-23.8. J.Abreu
34 23.-30.8. C.Buchbender

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)