|
Size: 1213
Comment:
|
Size: 1885
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 18: | Line 18: |
| 24;14.-21.6.;C.Buchbender;; 25;21.-28.6.;G.Quintana-Lacaci (remotely from Granada), F.Damour (night-time op.);; 26;28.6.-5.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests; 27;5.-12.7.; J.Abreu/S.Morales;; 28;12.-19.7.; M.Gonzalez/N.Billot; 12.-14.7. 32GHz-FTS-System commissioning; |
24;14.-21.6.;C.Buchbender and J.Abreu (17-21.6);; 25;21.-28.6.;G.Quintana-Lacaci (remotely), F.Damour (night-time op.);; 26.1;27.6.-1.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests; 26.2;1.-5.7.; C.Buchbender;; 27;5.-12.7.; J.Abreu;; 28;12.-19.7.; A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue); 12.-14.7. 32GHz-FTS-System tests, additional support by N.Billot (Tue-Sun), G.Paubert; |
| Line 24: | Line 25: |
| 30;26.7.-2.8.; A.Sievers/N.Billot; 25.-28.7. TT-NCS 32GHz-FTS-System; 31;2.-9.8.;;; |
30;26.7.-2.8.; M.Gonzalez (Mon-Fri), A.Sievers (Fri-Tue)/N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu); 31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); plan: FTS is available again to all observers; |
| Line 27: | Line 28: |
| 33;16.-23.8.; J.Abreu; 34;23.-30.8.; C.Buchbender; |
33;16.-23.8.; J.Abreu; (225-10 17.-19. C.Buchbender); 34;23.-30.8.; C.Buchbender/S.Morales; 35;30.8.-6.9.;;; 36;6.9.-13.9.;;; 37;13.9.-20.9.;; Heavy Maintenance: Gearboxes, Computers, ...; 38;20.9.-27.9.;;; 39;27.9.-4.10.;;; 40;4.10.-11.10.;; 3mm VLBI; 41;11.10.-18.10.;;; 42;18.10.-25.10.;; NIKA run; 43;25.10.-1.11.;;; |
