|
Size: 1158
Comment:
|
Size: 1377
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 17: | Line 17: |
| 23;7.-14.6.;D.Riquelme;; 24;14.-21.6.;C.Buchbender;; 25;21.-28.6.;G.Quintana-Lacaci (remotely from Granada), F.Damour (night-time op.);; 26;28.6.-5.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests; 27;5.-12.7.; J.Abreu/S.Morales;; 28;12.-19.7.; M.Gonzalez/N.Billot; 12.-14.7. 32GHz-FTS-System commissioning; |
23;7.-14.6.;D.Riquelme; 228-09; 24;14.-21.6.;C.Buchbender and J.Abreu (17-21.6);; 25;21.-28.6.;G.Quintana-Lacaci (remotely), F.Damour (night-time op.);; 26.1;27.6.-1.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests; 26.2;1.-5.7.; C.Buchbender;; 27;5.-12.7.; J.Abreu;; 28;12.-19.7.; A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue), N.Billot; 12.-14.7. 32GHz-FTS-System tests; |
| Line 24: | Line 25: |
| 30;26.7.-2.8.; A.Sievers; 25.-28.7. TT-NCS 32GHz-FTS-System; 31;2.-9.8.; ?/N.Billot;; 32;9.-16.8.;; |
30;26.7.-2.8.; M.Gonzalez (Tue-Fri), A.Sievers (Fri-Tue), N.Billot; 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning; 31;2.-9.8.; F.Damour (day-time op.), G.Quintana-Lacaci (remotely);; 32;9.-16.8.; M.Gonzalez/S.Morales; |
| Line 28: | Line 29: |
| 34;23.-30.8.; C.Buchbender; |
