|
Size: 1759
Comment:
|
Size: 2353
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 8: | Line 8: |
| 51;28.12.2010-4.1.2011;J.Abreu (J.Santiago, night-time-operator);restart of HERA pool on Friday 7.1.; 1;4.1.2011-11.1.;C.Buchbender (M.Ruiz, night-time-operator); HERA pool week; 2;11.1.-18.1.;M.Gonzalez; HERA pool week; 3;18.1.-25.1.;G.Quintana-Lacaci (18.1-21.1)/J.Abreu (21.1-25.1) ; MAMBO pool week; 4;25.1.-1.2.;H.Ungerechts; 5;1.2.-8.2.;G.Paubert; 6;8.2.-15.2.;G.Quintana; MAMBO pool week; 7;15.2.-22.2.;M.Gonzalez(15.2.-17.2.)/A.Sievers(18.2.-22.2.); HERA pool week; 8;22.2.-1.3.;J.Abreu ; MAMBO pool week; 9;1.3.-8.3.;M.Gonzalez; HERA pool week; 10;8.3.-15.3.;D.Riquelme;; 11;15.3.-22.3.;J.Abreu; Reserve pool week; 12;22.3.-29.3.;C.Buchbender; NCS tests 21.-24., New continuum backends, VLBI@1mm fringe test 25.-28., 228-09; 13;29.3.-5.4.;D.Riquelme (29.3.-1.4.)/ M.Gonzalez (1.4.-5.4.); VLBI@1mm; |
|
| Line 31: | Line 17: |
| 23;7.-14.6.;D.Riquelme;; 24;14.-21.6.;C.Buchbender;; 25;21.-28.6.;G.Quintana-Lacaci (remotely from Granada);; 26;28.6.-5.7.;; Installation of 32GHz-IF-System; 27;5.-12.7.;;; 28;12.-19.7.;;; 29;19.-26.7.;;; 30;26.7.-2.8.;;; 31;2.-9.8.;G.Quintana-Lacaci (remotely from Granada);; |
23;7.-14.6.;D.Riquelme; 228-09; 24;14.-21.6.;C.Buchbender and J.Abreu (17-21.6);; 25;21.-28.6.;G.Quintana-Lacaci (remotely), F.Damour (night-time op.);; 26.1;27.6.-1.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests; 26.2;1.-5.7.; C.Buchbender;; 27;5.-12.7.; J.Abreu;; 28;12.-19.7.; A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue); 12.-14.7. 32GHz-FTS-System tests, additional support by N.Billot (Tue-Sun), G.Paubert; 29;19.-26.7.; C.Buchbender/S.Trevino;; 30;26.7.-2.8.; M.Gonzalez (Mon-Fri), A.Sievers (Fri-Tue)/N.Billot(Fri-Tue); 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning, additional support by J.Abreu (Mon-Fri), C.Kramer (Tue-Fri), P.Gratier (from Grenoble on Wed,Thu); 31;2.-9.8.; C.Buchbender (Tue-Fri), G.Quintana-Lacaci (remotely, Fri-Tue), F.Damour (day-time op.); plan: FTS is available again to all observers; 32;9.-16.8.; M.Gonzalez/S.Trevino; 33;16.-23.8.; J.Abreu; (225-10 17.-19. C.Buchbender); 34;23.-30.8.; C.Buchbender/S.Trevino; 35;30.8.-6.9.; J.Santiago (day time op.);; 36;6.9.-13.9.; J.Abreu/S.Trevino;; 37;13.9.-20.9.; J.Santiago (day time op.); Heavy Maintenance: Gearboxes, Computers, ...; 38;20.9.-27.9.; A.Sievers/S.Trevino; Summerschool 23.-30.9. Fri-Fri; 39;27.9.-4.10.; G.Quintana-Lacaci (remotely from Granada), F.Damour (night time op.); Summerschool till 30.9.; 40;4.10.-11.10.; M.Ruiz; 3mm VLBI 6.-11.10.; 41;11.10.-18.10.; S.Trevino;; 42;18.10.-25.10.; A.Sievers; NIKA run; 43;25.10.-1.11.; J.Abreu;; 44;1.-8.11.; S.Trevino; EMIR Upgrade of E0 & E3 with new switchbox: 3.-10.11.; 45;8.-15.11.; M.Gonzalez; EMIR Commissioning: 10.-15.11.; 46;15.-22.11.; G.Paubert;; 47;22.-29.11.; J.Abreu;; |
| Line 43: | Line 46: |
| * AodSchedule111 | * AodSchedule111, AodSchedule211 |
