Size: 1759
Comment:
|
Size: 1156
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
51;28.12.2010-4.1.2011;J.Abreu (J.Santiago, night-time-operator);restart of HERA pool on Friday 7.1.; 1;4.1.2011-11.1.;C.Buchbender (M.Ruiz, night-time-operator); HERA pool week; 2;11.1.-18.1.;M.Gonzalez; HERA pool week; 3;18.1.-25.1.;G.Quintana-Lacaci (18.1-21.1)/J.Abreu (21.1-25.1) ; MAMBO pool week; 4;25.1.-1.2.;H.Ungerechts; 5;1.2.-8.2.;G.Paubert; 6;8.2.-15.2.;G.Quintana; MAMBO pool week; 7;15.2.-22.2.;M.Gonzalez(15.2.-17.2.)/A.Sievers(18.2.-22.2.); HERA pool week; 8;22.2.-1.3.;J.Abreu ; MAMBO pool week; 9;1.3.-8.3.;M.Gonzalez; HERA pool week; 10;8.3.-15.3.;D.Riquelme;; 11;15.3.-22.3.;J.Abreu; Reserve pool week; 12;22.3.-29.3.;C.Buchbender; NCS tests 21.-24., New continuum backends, VLBI@1mm fringe test 25.-28., 228-09; 13;29.3.-5.4.;D.Riquelme (29.3.-1.4.)/ M.Gonzalez (1.4.-5.4.); VLBI@1mm; |
|
Line 33: | Line 19: |
25;21.-28.6.;G.Quintana-Lacaci (remotely from Granada);; 26;28.6.-5.7.;; Installation of 32GHz-IF-System; 27;5.-12.7.;;; 28;12.-19.7.;;; 29;19.-26.7.;;; 30;26.7.-2.8.;;; 31;2.-9.8.;G.Quintana-Lacaci (remotely from Granada);; |
25;21.-28.6.;G.Quintana-Lacaci (remotely from Granada), F.Damour (night-time op.);; 26;28.6.-5.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests; 27;5.-12.7.; J.Abreu/S.Morales;; 28;12.-19.7.; M.Gonzalez/N.Billot; 12.-14.7. 32GHz-FTS-System commissioning; 29;19.-26.7.; C.Buchbender/S.Morales;; 30;26.7.-2.8.; A.Sievers; 25.-28.7. TT-NCS 32GHz-FTS-System; 31;2.-9.8.; J.Abreu/N.Billot;; 32;9.-16.8.;; 33;16.-23.8.;; |