Line 8: Line 8:
51;28.12.2010-4.1.2011;J.Abreu (J.Santiago, night-time-operator);restart of HERA pool on Friday 7.1.;
1;4.1.2011-11.1.;C.Buchbender (M.Ruiz, night-time-operator); HERA pool week;
2;11.1.-18.1.;M.Gonzalez; HERA pool week;
3;18.1.-25.1.;G.Quintana-Lacaci (18.1-21.1)/J.Abreu (21.1-25.1) ; MAMBO pool week;
4;25.1.-1.2.;H.Ungerechts;
5;1.2.-8.2.;G.Paubert;
6;8.2.-15.2.;G.Quintana; MAMBO pool week;
7;15.2.-22.2.;M.Gonzalez(15.2.-17.2.)/A.Sievers(18.2.-22.2.); HERA pool week;
8;22.2.-1.3.;J.Abreu ; MAMBO pool week;
9;1.3.-8.3.;M.Gonzalez; HERA pool week;
10;8.3.-15.3.;D.Riquelme;;
11;15.3.-22.3.;J.Abreu; Reserve pool week;
12;22.3.-29.3.;C.Buchbender; NCS tests 21.-24., New continuum backends, VLBI@1mm fringe test 25.-28., 228-09;
13;29.3.-5.4.;D.Riquelme (29.3.-1.4.)/ M.Gonzalez (1.4.-5.4.); VLBI@1mm;
Line 31: Line 17:
23;7.-14.6.;D.Riquelme;;
24;14.-21.6.;C.Buchbender;;
25;21.-28.6.;G.Quintana-Lacaci (remotely from Granada);;
26;28.6.-5.7.;; Installation of 32GHz-IF-System;
27;5.-12.7.;;;
28;12.-19.7.;;;
29;19.-26.7.;;;
30;26.7.-2.8.;;;
31;2.-9.8.;G.Quintana-Lacaci (remotely from Granada);;
23;7.-14.6.;D.Riquelme; 228-09;
24;14.-21.6.;C.Buchbender and J.Abreu (17-21.6);;
25;21.-28.6.;G.Quintana-Lacaci (remotely), F.Damour (night-time op.);;
26.1;27.6.-1.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests;
26.2;1.-5.7.; C.Buchbender;;
27;5.-12.7.; J.Abreu;;
28;12.-19.7.; A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue), N.Billot; 12.-14.7. 32GHz-FTS-System tests;
29;19.-26.7.; C.Buchbender/S.Morales;;
30;26.7.-2.8.; M.Gonzalez (Tue-Fri), A.Sievers (Fri-Tue), N.Billot; 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning;
31;2.-9.8.; F.Damour (day-time op.), G.Quintana-Lacaci (remotely);;
32;9.-16.8.; M.Gonzalez/S.Morales;
33;16.-23.8.; J.Abreu;
34;23.-30.8.; C.Buchbender;
Line 43: Line 33:
 * AodSchedule111

Week Dates AoD Comments
14 5.4.-12.4. J.Abreu
15 12.4.-19.4. G.Quintana-Lacaci GISMO 4th test run
16 19.-26.4. C.Buchbender Semana Santa
17 26.4.-3.5. M.Gonzalez
18 3.-10.5. D.Riquelme (3.-5.5.), M.Ruiz VLBI@3mm
19 10.-17.5. J.Abreu
20 17.-24.5. C.Buchbender
21 24.-31.5. G.Paubert
22 31.5.-7.6. J.Abreu (Toledo conference 30.5.-3.6.)
23 7.-14.6. D.Riquelme 228-09
24 14.-21.6. C.Buchbender and J.Abreu (17-21.6)
25 21.-28.6. G.Quintana-Lacaci (remotely), F.Damour (night-time op.)
26.1 27.6.-1.7. G.Paubert 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests
26.2 1.-5.7. C.Buchbender
27 5.-12.7. J.Abreu
28 12.-19.7. A.Sievers (Tue-Fri), M.Gonzalez (Fri-Tue), N.Billot 12.-14.7. 32GHz-FTS-System tests
29 19.-26.7. C.Buchbender/S.Morales
30 26.7.-2.8. M.Gonzalez (Tue-Fri), A.Sievers (Fri-Tue), N.Billot 25.-28.7. TT-NCS 32GHz-FTS-System science commissioning
31 2.-9.8. F.Damour (day-time op.), G.Quintana-Lacaci (remotely)
32 9.-16.8. M.Gonzalez/S.Morales
33 16.-23.8. J.Abreu
34 23.-30.8. C.Buchbender