Line 23: | Line 23: |
15;12.4.-19.4.;G.Quintana-Lacaci; GISMO; | 15;12.4.-19.4.;G.Quintana-Lacaci; GISMO 4th test run; |
Line 25: | Line 25: |
17;26.4.-3.5.;M.Gonzalez; Installation of 32GHz IF 25.-27.4. + 1st days of commissioning 27./28.4.; 18;3.-10.5.;D.Riquelme(needed?), J.Santiago (night-time operator); VLBI@3mm; 19;10.-17.5.;M.Gonzalez/J.Abreu; 32GHz Comm. T17-10 12.-14.5.; 20;17.-24.5.;C.Buchbender;; |
17;26.4.-3.5.;M.Gonzalez; ; 18;3.-10.5.;D.Riquelme (3.-5.5.), J.Santiago (night-time operator); VLBI@3mm; 19;10.-17.5.;M.Gonzalez/J.Abreu; ; 20;17.-24.5.;C.Buchbender; ; |