Line 23: Line 23:
15;12.4.-19.4.;G.Quintana-Lacaci; GISMO + 32GHzIF installation; 15;12.4.-19.4.;G.Quintana-Lacaci; GISMO;
Line 25: Line 25:
17;26.4.-3.5.;M.Gonzalez;32GHzIF on-the-sky commissioning 25.-28.4.; 17;26.4.-3.5.;M.Gonzalez; Installation of 32GHzIF 25.-27.4. + 1st days of commissioning 27./28.4.;

Week Dates AoD Comments
51 28.12.2010-4.1.2011 J.Abreu (J.Santiago, night-time-operator) restart of HERA pool on Friday 7.1.
1 4.1.2011-11.1. C.Buchbender (M.Ruiz, night-time-operator) HERA pool week
2 11.1.-18.1. M.Gonzalez HERA pool week
3 18.1.-25.1. G.Quintana-Lacaci (18.1-21.1)/J.Abreu (21.1-25.1) MAMBO pool week
4 25.1.-1.2. H.Ungerechts
5 1.2.-8.2. G.Paubert
6 8.2.-15.2. G.Quintana MAMBO pool week
7 15.2.-22.2. M.Gonzalez(15.2.-17.2.)/A.Sievers(18.2.-22.2.) HERA pool week
8 22.2.-1.3. J.Abreu MAMBO pool week
9 1.3.-8.3. M.Gonzalez HERA pool week
10 8.3.-15.3. D.Riquelme
11 15.3.-22.3. J.Abreu Reserve pool week
12 22.3.-29.3. C.Buchbender NCS tests 21.-24., New continuum backends, VLBI@1mm fringe test 25.-28., 228-09
13 29.3.-5.4. D.Riquelme (29.3.-1.4.)/ M.Gonzalez (1.4.-5.4.) VLBI@1mm
14 5.4.-12.4. J.Abreu
15 12.4.-19.4. G.Quintana-Lacaci GISMO
16 19.-26.4. C.Buchbender Semana Santa
17 26.4.-3.5. M.Gonzalez Installation of 32GHzIF 25.-27.4. + 1st days of commissioning 27./28.4.
18 3.-10.5. D.Riquelme VLBI@3mm

Old AoD Plans: