Line 16: | Line 16: |
8;22.2.-1.3.;G.Quintana-Lacaci/J.Abreu (25.3-1.3); MAMBO pool week; | 8;22.2.-1.3.;J.Abreu ; MAMBO pool week; |
Line 20: | Line 20: |
12;22.3.-29.3.;C.Buchbender; VLBI@1mm fringe test, 228-09; 13;29.3.-5.4.;D.Riquelme; VLBI@1mm; |
12;22.3.-29.3.;C.Buchbender; NCS tests 21.-24., New continuum backends, VLBI@1mm fringe test 25.-28., 228-09; 13;29.3.-5.4.;D.Riquelme (29.3.-1.4.)/ M.Gonzalez (1.4.-5.4.); VLBI@1mm; |
Line 23: | Line 23: |
15;12.4.-19.4.;G.Quintana-Lacaci; GISMO + 32GHzIF installation; | 15;12.4.-19.4.;G.Quintana-Lacaci; GISMO; |
Line 25: | Line 25: |
17;26.4.-3.5.;M.Gonzalez;32GHzIF on-the-sky commissioning; 18;3.-10.5.;D.Riquelme; VLBI@3mm; |
17;26.4.-3.5.;M.Gonzalez; Installation of 32GHz IF 25.-27.4. + 1st days of commissioning 27./28.4.; 18;3.-10.5.;D.Riquelme(needed?), J.Santiago (night-time operator); VLBI@3mm; 19;10.-17.5.;J.Abreu; T17-10 12.-14.5.; 20;17.-24.5.;C.Buchbender;; |