|
Size: 1244
Comment:
|
Size: 1005
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 8: | Line 8: |
| 51;28.12.2010-4.1.2011;J.Abreu (J.Santiago, night-time-operator);restart of HERA pool on Friday 7.1.; 1;4.1.2011-11.1.;C.Buchbender (M.Ruiz, night-time-operator); HERA pool week; 2;11.1.-18.1.;M.Gonzalez; HERA pool week; 3;18.1.-25.1.;G.Quintana-Lacaci (18.1-21.1)/J.Abreu (21.1-25.1) ; MAMBO pool week; 4;25.1.-1.2.;H.Ungerechts; 5;1.2.-8.2.;G.Paubert; 6;8.2.-15.2.;G.Quintana; MAMBO pool week; 7;15.2.-22.2.;M.Gonzalez(15.2.-17.2.)/A.Sievers(18.2.-22.2.); HERA pool week; 8;22.2.-1.3.;G.Quintana-Lacaci/J.Abreu (25.3-1.3); MAMBO pool week; 9;1.3.-8.3.;M.Gonzalez; HERA pool week; 10;8.3.-15.3.;D.Riquelme;; 11;15.3.-22.3.;J.Abreu; Reserve pool week; 12;22.3.-29.3.;C.Buchbender; VLBI@1mm fringe test, 228-09; 13;29.3.-5.4.;D.Riquelme; VLBI@1mm; 14;5.4.-12.4.;J.Abreu;; 15;12.4.-19.4.;G.Quintana-Lacaci; GISMO + 32GHzIF installation; 16;19.-26.4.;C.Buchbender;Semana Santa; 17;26.4.-3.5.;M.Gonzalez;32GHzIF on-the-sky commissioning; |
13;27.-3.4.; J.Abreu;; 14;3.-10.4.; S.Trevino; Semana Santa; 15;10.-17.4.; A.Sievers; GISMO Week I; 16;17.-24.4.; J.Abreu; GISMO Week II, PC-Meeting 24./25.; 17;24.-1.5.; C.Buchbender;; 18;1.-8.5.; N.Billot;; 19;8.-15.5.; S.Trevino; SAC-Meeting 10./11.; 20;15.-22.5.; J.Abreu/M.Ruiz/G.Bruni; VLBI@3mm 17.-22.; 21;22.-29.5.; M.Gonzalez;; 22;29.-5.6.; A.Sievers; NIKA tests, Start of summer semester; 23;5.-12.6.; N.Billot/G.Bruni; A.Castets & Students visiting on 6.6.; 24;12.-19.6.; C.Buchbender;; 25;19.-26.6.; J.Abreu/G.Bruni;; 26;26.6.-3.7.; S.Trevino;; 27;3.-10.7.; H.Ungerechts;; 28;10.-17.7.; M.Gonzalez;; |
| Line 29: | Line 27: |
| * AodSchedule112 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111 |
