Size: 1929
Comment:
|
Size: 1215
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
40;5.10.-12.10.2010;M.Ruiz;Global 3mm VLBI (7.-12.10.); 41;12.10.-19.10.;J.Abreu & H.Ungerechts (14.-19.10.); NIKA arrives on 14.10. ; 42;19.10.-26.10.;D.Riquelme; NIKA run + Obs.; 43;26.10.-2.11.;G.Quintana-Lacaci (25.-29.10.), C.Buchbender (29.10.-2.11.), J.Abreu (29.10.-5.11.);MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek; 44;2.11.-9.11.;M.Gonzalez (2.-7.11.) & J.Abreu (29.10.-5.11.), M.Ruiz (8.-9.11., day-time operator);HERA Poolweek, HERM33ES workshop 8./9.11.; 45;9.11.-16.11.;A.Sievers;MAMBO2 Poolweek; 46;16.11.-23.11.;M.Gonzalez;HERA Poolweek; 47;23.11.-30.11.;J.Abreu;Reserve Poolweek, End of Summersemester 2010; 48;30.11.-7.12.;C.Buchbender;+++Start of winter semester 2010/11+++; 49;7.12.-14.12.;D.Riquelme/M.Gonzalez (replacing G.Quintana-Lacaci); 1st MAMBO2; 50;14.12.-21.12.;M.Gonzalez (F.Damour, day-time-operator);1st HERA Poolweek; 51;21.12.-28.12.;D.Riquelme (F.Damour, day-time-operator);; |
|
Line 26: | Line 14: |
6;8.2.-15.2.;J.Abreu/G.Quintana(11.2-15.2); MAMBO pool week; 7;15.2.-17.2.;M.Gonzalez/A.Sievers(18.2.-22.2.); HERA pool week; |
6;8.2.-15.2.;G.Quintana; MAMBO pool week; 7;15.2.-22.2.;M.Gonzalez(15.2.-17.2.)/A.Sievers(18.2.-22.2.); HERA pool week; |
Line 32: | Line 20: |
12;22.3.-29.3.;C.Buchbender;228-09 scheduled; | 12;22.3.-29.3.;C.Buchbender; 228-09 scheduled; 13;29.3.-5.4.;D.Riquelme;; 14;5.4.-12.4.;J.Abreu;; 15;12.4.-19.4.;G.Quintana-Lacaci; GISMO + 32GHzIF installation; 16;19.-26.4.;C.Buchbender;Semana Santa; 17;26.4.-3.5.;M.Gonzalez;32GHzIF on-the-sky commissioning; |
Line 36: | Line 29: |
* AodSchedule310, AodSchedule210, AodSchedule110 | * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110 |