| 49;7.12.-14.12.;D.Riquelme/M.Gonzalez (replacing G.Quintana-Lacaci); 1st MAMBO2 [[http://www.iram.es/IRAMES/mainWiki/PoolS10|Poolweek]] ; | 49;7.12.-14.12.;D.Riquelme/M.Gonzalez (replacing G.Quintana-Lacaci); 1st MAMBO2; |
| Line 23: | Line 23: |
| 3;18.1.-25.1.;G.Quintana-Lacaci; MAMBO pool week; | 3;18.1.-25.1.;G.Quintana-Lacaci (18.1-21.1)/J.Abreu (21.1-25.1) ; MAMBO pool week; |
| Line 26: | Line 26: |
| 6;8.2.-15.2.;J.Abreu; MAMBO pool week; 7;15.2.-22.2.;M.Gonzalez; HERA pool week; 8;22.2.-1.3.;G.Quintana-Lacaci; MAMBO pool week; |
6;8.2.-15.2.;G.Quintana; MAMBO pool week; 7;15.2.-22.2.;M.Gonzalez(15.2.-17.2.)/A.Sievers(18.2.-22.2.); HERA pool week; 8;22.2.-1.3.;G.Quintana-Lacaci/J.Abreu (25.3-1.3); MAMBO pool week; |
| Line 32: | Line 32: |
| 12;22.3.-29.3.;C.Buchbender;228-09 scheduled; | 12;22.3.-29.3.;C.Buchbender; 228-09 scheduled; 13;29.3.-5.4.;D.Riquelme;; 14;5.4.-12.4.;J.Abreu;; 15;12.4.-19.4.;G.Quintana-Lacaci; GISMO + 32GHzIF installation; 16;19.-26.4.;C.Buchbender;Semana Santa; 17;26.4.-3.5.;M.Gonzalez;32GHzIF on-the-sky commissioning; |
| Line 39: | Line 44: |
||||||<tablewidth="80%">'''Heading'''|| ||cell 1||cell2||[[http://www.iram.es/IRAMES/mainWiki/PoolS10|Poolweek]]|| |