Differences between revisions 450 and 511 (spanning 61 versions)
Revision 450 as of 2010-10-25 14:16:34
Size: 1307
Editor: visitor2
Comment:
Revision 511 as of 2011-05-06 07:54:41
Size: 937
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
40;5.10.-12.10.2010;M.Ruiz;Global 3mm VLBI (7.-12.10.);
41;12.10.-19.10.;J.Abreu & H.Ungerechts (14.-19.10.); NIKA arrives on 14.10. ;
42;19.10.-26.10.;D.Riquelme; NIKA run + Obs.;
43;26.10.-2.11.;G.Quintana-Lacaci (25.-29.10.), C.Buchbender (29.10.-2.11.);MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek;
44;2.11.-9.11.;M.Gonzalez & J.Abreu (2.-7.11.), M.Ruiz (8.-9.11., day-time operator);HERA Poolweek, HERM33ES workshop 8./9.11.;
45;9.11.-16.11.;A.Sievers;MAMBO2 Poolweek;
46;16.11.-23.11.;M.Gonzalez;HERA Poolweek;
47;23.11.-30.11.;J.Abreu;Reserve Poolweek, End of Summersemester 2010;
48;30.11.-7.12.;D.Riquelme;'''Start of winter semester 2010/11''';
49;7.12.-14.12.;G.Quintana-Lacaci; 1st MAMBO2 Poolweek;
50;14.12.-21.12.;M.Gonzalez (F.Damour, day-time-operator);1st HERA Poolweek;
51;21.12.-28.12.;D.Riquelme (F.Damour, day-time-operator);;
51;28.12.-4.1.;J.Abreu (J.Santiago, night-time-operator);restart of pools on Friday 7.1.;
1;4.1.2011-11.1.;C.Buchbender (M.Ruiz, night-time-operator);;
14;5.4.-12.4.;J.Abreu;;
15;12.4.-19.4.;G.Quintana-Lacaci; GISMO 4th test run;
16;19.-26.4.;C.Buchbender;Semana Santa;
17;26.4.-3.5.;M.Gonzalez; ;
18;3.-10.5.;D.Riquelme (3.-5.5.), M.Ruiz; VLBI@3mm;
19;10.-17.5.;J.Abreu; ;
20;17.-24.5.;C.Buchbender; ;
21;24.-31.5.;G.Paubert;;
22;31.5.-7.6.;J.Abreu; (Toledo conference 30.5.-3.6.);
23;7.-14.6.;D.Riquelme;;
24;14.-21.6.;C.Buchbender;;
25;21.-28.6.;G.Quintana-Lacaci (remotely from Granada);;
26;28.6.-5.7.;; Installation of 32GHz-IF-System;
27;5.-12.7.;;;
28;12.-19.7.;;;
29;19.-26.7.;;;
30;26.7.-2.8.;;;
31;2.-9.8.;G.Quintana-Lacaci (remotely from Granada);;
Line 25: Line 29:
 * AodSchedule310, AodSchedule210, AodSchedule110  * AodSchedule111
 * AodSchedule410,
AodSchedule310, AodSchedule210, AodSchedule110

Week Dates AoD Comments
14 5.4.-12.4. J.Abreu
15 12.4.-19.4. G.Quintana-Lacaci GISMO 4th test run
16 19.-26.4. C.Buchbender Semana Santa
17 26.4.-3.5. M.Gonzalez
18 3.-10.5. D.Riquelme (3.-5.5.), M.Ruiz VLBI@3mm
19 10.-17.5. J.Abreu
20 17.-24.5. C.Buchbender
21 24.-31.5. G.Paubert
22 31.5.-7.6. J.Abreu (Toledo conference 30.5.-3.6.)
23 7.-14.6. D.Riquelme
24 14.-21.6. C.Buchbender
25 21.-28.6. G.Quintana-Lacaci (remotely from Granada)
26 28.6.-5.7. Installation of 32GHz-IF-System
27 5.-12.7.
28 12.-19.7.
29 19.-26.7.
30 26.7.-2.8.
31 2.-9.8. G.Quintana-Lacaci (remotely from Granada)

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)