Line 8: Line 8:
27;6.7.-13.7.;J.Santiago (day-time operator);;
28;13.7.-20.7.;R.Aladro;;
29;20.7.-27.7.;F.Damour & M.Ruiz (operators);;
30;27.7.-3.8.;A.Sievers (27.+28.7.), M.Gonzalez (29.7.-3.8. during day-time from Granada), J.Santiago (night-time operator);;
31;3.8.-10.8.;C.Buchbender (-12.8.); 228-09;
32;10.8.-17.8.;D.Riquelme (12.8.-17.8.) & J.Abreu (10.-16.);;
33;17.8.-24.8.;M.Gonzalez & C.Kramer;HEMT Receiver: Installation & Tests;
34;24.8.-31.8.;D.Riquelme (24.8-27-8);;
35;31.8.-7.9.;R.Aladro (27.8.-3.9.), C.Buchbender (3.9.-10.9.) & J.Abreu (3.9.-7.9.); 228-09 (7.-13.9.);
36;7.9.-14.9.;C.Buchbender (3.9.-10.9.), A.Sievers (10.9.-14.9.);;
37;14.9.-21.9.;D.Riquelme & J.Abreu (-20.9.);;
38;21.9.-28.9.;G.Quintana-Lacaci (24.-27.9.);Heavy Maintenance: Exchange of El-Gearbox+Observations;
39;28.9.-5.10.;G.Paubert (1.-5.10.);Heavy Maintenance: Exchange of Az-Gearbox+Obs.;
40;5.10.-12.10.;M.Ruiz;Global 3mm VLBI (7.-12.10.);
40;5.10.-12.10.2010;M.Ruiz;Global 3mm VLBI (7.-12.10.);
Line 24: Line 11:
43;26.10.-2.11.;G.Quintana-Lacaci (25.-29.10.), C.Buchbender (29.10.-2.11.);MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek;
44;2.11.-9.11.;M.Gonzalez & J.Abreu (2.-7.11.), M.Ruiz (8.-9.11., day-time operator);HERA Poolweek, HERM33ES workshop 8./9.11.;
43;26.10.-2.11.;G.Quintana-Lacaci (25.-29.10.), C.Buchbender (29.10.-2.11.), J.Abreu (29.10.-5.11.);MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek;
44;2.11.-9.11.;M.Gonzalez (2.-7.11.) & J.Abreu (29.10.-5.11.), M.Ruiz (8.-9.11., day-time operator);HERA Poolweek, HERM33ES workshop 8./9.11.;
Line 29: Line 16:
48;30.11.-7.12.;D.Riquelme;'''Start of winter semester 2010/11'''; 48;30.11.-7.12.;C.Buchbender;+++Start of winter semester 2010/11+++;
Line 33: Line 20:
51;28.12.-4.1.;J.Abreu (J.Santiago, night-time-operator);restart of pools on 7.1.;
1;4.1.2011-11.1.;C.Buchbender (M.Ruiz, night-time-operator);;
51;28.12.-4.1.;J.Abreu (J.Santiago, night-time-operator);restart of HERA pool on Friday 7.1.;
1;4.1.2011-11.1.;C.Buchbender (M.Ruiz, night-time-operator); HERA pool week;
2;11.1.-18.1.;J.Abreu; MAMBO pool week;
3;18.1.-25.1.;M.Gonzalez; HERA pool week;
4;25.1.-1.2.;H.Ungerechts;
5;1.2.-8.2.;G.Paubert;
6;8.2.-15.2.;G.Quintana-Lacaci; MAMBO pool week;
7;15.2.-22.2.;M.Gonzalez; HERA pool week;
8;22.2.-1.3.;A.Sievers; MAMBO pool week;
9;1.3.-8.3.;M.Gonzalez; HERA pool week;
10;8.3.-15.3.;D.Riquelme; Reserve pool week;
11;15.3.-22.3.;;
12;22.3.-29.3.;;

Week Dates AoD Comments
40 5.10.-12.10.2010 M.Ruiz Global 3mm VLBI (7.-12.10.)
41 12.10.-19.10. J.Abreu & H.Ungerechts (14.-19.10.) NIKA arrives on 14.10.
42 19.10.-26.10. D.Riquelme NIKA run + Obs.
43 26.10.-2.11. G.Quintana-Lacaci (25.-29.10.), C.Buchbender (29.10.-2.11.), J.Abreu (29.10.-5.11.) MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek
44 2.11.-9.11. M.Gonzalez (2.-7.11.) & J.Abreu (29.10.-5.11.), M.Ruiz (8.-9.11., day-time operator) HERA Poolweek, HERM33ES workshop 8./9.11.
45 9.11.-16.11. A.Sievers MAMBO2 Poolweek
46 16.11.-23.11. M.Gonzalez HERA Poolweek
47 23.11.-30.11. J.Abreu Reserve Poolweek, End of Summersemester 2010
48 30.11.-7.12. C.Buchbender +++Start of winter semester 2010/11+++
49 7.12.-14.12. G.Quintana-Lacaci 1st MAMBO2 Poolweek
50 14.12.-21.12. M.Gonzalez (F.Damour, day-time-operator) 1st HERA Poolweek
51 21.12.-28.12. D.Riquelme (F.Damour, day-time-operator)
51 28.12.-4.1. J.Abreu (J.Santiago, night-time-operator) restart of HERA pool on Friday 7.1.
1 4.1.2011-11.1. C.Buchbender (M.Ruiz, night-time-operator) HERA pool week
2 11.1.-18.1. J.Abreu MAMBO pool week
3 18.1.-25.1. M.Gonzalez HERA pool week
4 25.1.-1.2. H.Ungerechts
5 1.2.-8.2. G.Paubert
6 8.2.-15.2. G.Quintana-Lacaci MAMBO pool week
7 15.2.-22.2. M.Gonzalez HERA pool week
8 22.2.-1.3. A.Sievers MAMBO pool week
9 1.3.-8.3. M.Gonzalez HERA pool week
10 8.3.-15.3. D.Riquelme Reserve pool week
11 15.3.-22.3.
12 22.3.-29.3.