|
Size: 502
Comment:
|
Size: 1501
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 4: | Line 4: |
| {{{ #!CSV ;;;; 1; 30.12.-6.1.; I.Hermelo;; 2; 6.-13.1.; C.Marka; Heterodyne Pool ; 3; 13.-20.1.; G.Paubert; Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?); 4; 20.-27.1.; M.Ruiz & I.Ruiz (operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.); 5; 27.1.-3.2.; N.Billot; NIKA Pool; 6; 3.-10.2.; I.Hermelo; NIKA Pool; 7; 10.-17.2.; A.Sievers; NIKA Polarimetry test run; 8; 17.-24.2.; N.Billot;; 9; 24.2.-3.3.; I.Hermelo; GISMO Pool; 10; 3.-10.3.; G.Paubert; Pulsar observations; 11; 10.-17.3.; C.Marka; IRAM Deadline on 12-Mar; 12; 17.-24.3.; S.Trevino; Heterodyne Pool (flexible 1mm VLBI); 13; 24.-31.3.; C.Marka; Heterodyne Pool(flexible 1mm VLBI); 14; 31.3.-7.4.; H.Ungerechts (from Granada);; 15; 7.-14.4.; G.Paubert (from Granada); Installation of new optics; 16; 14.-21.4.; A.Sievers; Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.); 17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations; 18; 28.4.-5.5.; ;; 19; 5.-12.5.; N.Billot;; 20; 12.-19.5.; ;; 21; 19.-26.5.; ;; 22; 26.5.-2.6.; ;; }}} |
|
| Line 5: | Line 31: |
{{{#!CSV Week ; Dates ; AoD ; Comments 22; 30.5.-6.6.2006;Leon; 23; 6.6.-13.6.;Marcelino; 24; 13.6.-20.6.;Sievers(Tue-Fri) Ungerechts (Fri-Tue); 25; 20.6.-27.6.;Ocana; 26; 27.6.-4.7.;Marcelino; 27; 4.7.-11.7.;; 28; 11.7.-18.7.;; 29; 18.7.-25.7.;; 30; 25.7.-1.8.;; 31; 1.8.-8.8.;; 32; 8.8.-15.8.;; 33; 15.8.-22.8.;; 34; 22.8.-29.8.;; 35; 29.8.-5.9.;; 36; 5.9.-12.9.; 37; 12.9.-19.9.;; 38; 19.9.-26.9.;; 39; 26.9.-3.10.;; }}} |
Old AoD Plans: * AodSchedule14 * AodSchedule13 * AodSchedule112, AodSchedule212, AodSchedule3412 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111 * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109 * AodSchedule408, AodSchedule308 |
Old AoD Plans:
