Differences between revisions 35 and 101 (spanning 66 versions)
Revision 35 as of 2006-04-06 12:39:28
Size: 766
Editor: visitor11
Comment:
Revision 101 as of 2007-12-12 09:16:02
Size: 1402
Editor: visitor12
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:


Line 8: Line 5:



14; 4.4-11.4.;Paubert (Tue-Fri) Sievers (Fri-Tue);
15; 11.4.-18.4.;Ocana; night operator can also be consulted
16; 18.4.-25.4.;Ungerechts (Tue-Fri), Paubert (Fri-Tue); HU can be contacted during day time
17; 25.4.-2.5.;Martin;
18; 2.5.-9.5.;Damour (Tue-Thu) Ruiz (Thu-Tue);Damour can be contacted during his shift, VLBI 4.-10.5.
19; 9.5.-16.5.;Ruiz (Tue-Wed) NCS team (Wed-Fri) Paubert (Fri-Tue);VLBI-10.5.
20; 16.5.-23.5.;Damour;AoD can be contacted during his night shift
21; 23.5.-30.5.;Martin;
22; 30.5.-6.6.;Leon;
23; 6.6.-13.6.;Marcelino;
24; 13.6.-20.6.;Sievers(Tue-Fri) Ungerechts (Fri-Tue);
25; 20.6.-27.6.;Ocana;
26; 27.6.-4.7.;Marcelino;
}}}
40;2.10.-9.10.;Ocana; MAMBO pool
41;9.10.-16.10.; Ruiz; VLBI
42;16.10.-23.10.;Aladro (Tue-Fri), Paubert (Fri-Mon); (Monday-Tuesday 22/23.10: H. Ungerechts)
43;23.10.-30.10.;Wiesemeyer (Tue-Fri), Aladro(Fri-Tue);HERA Pool
44;30.10.-6.11.;Aladro(Tue-Fri), Wiesemeyer(Fri-Tue); GIZMO Installation & HERA Pool
45;6.11.-13.11.;Sievers (Tue-Thur), Thum (Thur-Tue);GIZMO PI Observing,
46;13.11.-20.11.;Leon; MAMBO Pool
47;20.11.-27.11.;Wiesemeyer (Tue-Fri), Aladro(+Riquelme) (Fri-Tue); HERA Pool
48;27.11.-4.12.;Ocana; MAMBO Pool
49;4.12.-11.12.;Ruiz (+Riquelme);
50;11.12.-18.12.;Paubert;
51;18.12.-25.12.;Leon (Tue-Mon); MAMBO Pool
52;25.12.-1.1.07;Aladro (Mon-Fri), Damour (Fri-Tue); Damour can be contacted during his night shift
1;1.1.2008-8.1.; Ungerechts (Tue-Fri), Riquelme&Aladro (Fri-Tue); HERA pool (Fri-Tue);
2;8.1.-15.1.;;HERA pool
3;15.1.-22.1.;Leon(Fri-Tue);HERA pool (Tue-Fri), Mambo pool (Fri-Tue)
4;22.1.-29.1.;Leon(Tue-Fri), Ocana (Fri-Tue); Mambo pool
5;29.1.-5.2.;Ocana (Tue-Fri); Mambo pool (Tue-Fri);
6;5.2.-12.2.;;
7;12.2.-19.2.;Aladro; HERA pool
8.;19.2.-26.2.;Riquelme; HERA pool
9;26.2.-4.3.;Leon; Mambo pool
10;4.3.-11.3.;Ocana; Mambo pool
11;11.3.-18.3.;Leon; Mambo pool
12;18.3.-25.3.;;
13;25.3.-1.4.;Wiesemeyer; HERA pool
14;1.4.-6.4.;Leon; Mambo pool (?)}}}

Week Dates AoD Comments
40 2.10.-9.10. Ocana MAMBO pool
41 9.10.-16.10. Ruiz VLBI
42 16.10.-23.10. Aladro (Tue-Fri), Paubert (Fri-Mon) (Monday-Tuesday 22/23.10: H. Ungerechts)
43 23.10.-30.10. Wiesemeyer (Tue-Fri), Aladro(Fri-Tue) HERA Pool
44 30.10.-6.11. Aladro(Tue-Fri), Wiesemeyer(Fri-Tue) GIZMO Installation & HERA Pool
45 6.11.-13.11. Sievers (Tue-Thur), Thum (Thur-Tue) GIZMO PI Observing,
46 13.11.-20.11. Leon MAMBO Pool
47 20.11.-27.11. Wiesemeyer (Tue-Fri), Aladro(+Riquelme) (Fri-Tue) HERA Pool
48 27.11.-4.12. Ocana MAMBO Pool
49 4.12.-11.12. Ruiz (+Riquelme)
50 11.12.-18.12. Paubert
51 18.12.-25.12. Leon (Tue-Mon) MAMBO Pool
52 25.12.-1.1.07 Aladro (Mon-Fri), Damour (Fri-Tue) Damour can be contacted during his night shift
1 1.1.2008-8.1. Ungerechts (Tue-Fri), Riquelme&Aladro (Fri-Tue) HERA pool (Fri-Tue)
2 8.1.-15.1. HERA pool
3 15.1.-22.1. Leon(Fri-Tue) HERA pool (Tue-Fri), Mambo pool (Fri-Tue)
4 22.1.-29.1. Leon(Tue-Fri), Ocana (Fri-Tue) Mambo pool
5 29.1.-5.2. Ocana (Tue-Fri) Mambo pool (Tue-Fri)
6 5.2.-12.2.
7 12.2.-19.2. Aladro HERA pool
8. 19.2.-26.2. Riquelme HERA pool
9 26.2.-4.3. Leon Mambo pool
10 4.3.-11.3. Ocana Mambo pool
11 11.3.-18.3. Leon Mambo pool
12 18.3.-25.3.
13 25.3.-1.4. Wiesemeyer HERA pool
14 1.4.-6.4. Leon Mambo pool (?)

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)