|
Size: 1400
Comment:
|
Size: 2180
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 6: | Line 6: |
| Week ; Dates ; AoD ; Comments 40;29.9.-6.10.;R.Aladro;HERA pool 41;6.10.-13.10;H.Ungerechts (6.10.-8.10.) & M.Ruiz (entire week);VLBI(8.-13.10.) 42;13.10.-20.10;H.Wiesemeyer&M.Gonzalez(13.-16.), C.Thum(16.-20.); (HERA pool, Installation of NIKA on 16.10. with limited access to Rx cabin (about 1hour daily)) 43;20.10.-27.10;C.Buchbender(20.-23.), A.Sievers(23.-27.10.); (NIKA 21.-27.10. T16-09 daytime, PC Meeting 27./28.10.) 44;27.10.-3.11.;R.Aladro & M.Gonzalez; Removal of NIKA on 27.10. during Wed maintenance, HERA pool 45;3.11.-10.11.;G.Quintana-Lacaci; T05-09 + MAMBO pool 46;10.11.-17.11.;M.Gonzalez & C.Buchbender;HERA pool 47;17.11.-24.11.;B.Ocana; 48;24.11.-1.12.;D.Riquelme;HERA pool backup 49;1.12.-8.12.;C.Buchbender; 50;8.12.-15.12.;A.Sievers;MAMBO pool 51;15.12.-22.12.;C.Buchbender(15.-18.), M.Gonzalez(18.-22.);HERA pool 52;22.12.29.12.;D.Riquelme; 53;29.12.-5.1.2010;R.Aladro; 1;5.1.-12.1.;B.Ocana(5-7), D.Riquelme(7-12);MAMBO pool 8.-19.1.; 2;12.1-19.1.; G.Quintana-Lacai;MAMBO pool; 3;19.1.-26.1.; M.Gonzalez;HERA pool; 4;26.1.-2.2.;HERA pool; 5;2.3.-9.3.; M.Gonzalez;HERA pool; 6;9.3.-16.3.;;MAMBO pool; 7;16.3.-23.3.;;visit of Paris students; 9;23.3.-30.3.; M.Gonzalez;HERA pool; ;;; |
;;;; Week ; Dates ; AoD ; Comments;; 27;6.7.-13.7.;J.Santiago (day-time operator);; 28;13.7.-20.7.;R.Aladro;; 29;20.7.-27.7.;F.Damour & M.Ruiz (operators);; 30;27.7.-3.8.;A.Sievers (27.+28.7.), M.Gonzalez (29.7.-3.8. during day-time from Granada), J.Santiago (night-time operator);; 31;3.8.-10.8.;C.Buchbender (-12.8.); 228-09; 32;10.8.-17.8.;D.Riquelme (12.8.-17.8.) & J.Abreu (10.-16.);; 33;17.8.-24.8.;M.Gonzalez & C.Kramer;HEMT Receiver: Installation & Tests; 34;24.8.-31.8.;D.Riquelme (24.8-27-8);; 35;31.8.-7.9.;R.Aladro (27.8.-3.9.), C.Buchbender (3.9.-10.9.) & J.Abreu (3.9.-7.9.); 228-09 (7.-13.9.); 36;7.9.-14.9.;C.Buchbender (3.9.-10.9.), A.Sievers (10.9.-14.9.);; 37;14.9.-21.9.;D.Riquelme & J.Abreu (-20.9.);; 38;21.9.-28.9.;G.Quintana-Lacaci (24.-27.9.);Heavy Maintenance: Exchange of El-Gearbox+Observations; 39;28.9.-5.10.;G.Paubert (1.-5.10.);Heavy Maintenance: Exchange of Az-Gearbox+Obs.; 40;5.10.-12.10.;M.Ruiz;Global 3mm VLBI (7.-12.10.); 41;12.10.-19.10.;J.Abreu & H.Ungerechts (14.-19.10.); NIKA arrives on 14.10. ; 42;19.10.-26.10.;D.Riquelme; NIKA run + Obs.; 43;26.10.-2.11.;G.Quintana-Lacaci (25.-29.10.), C.Buchbender (29.10.-2.11.);MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek; 44;2.11.-9.11.;M.Gonzalez & J.Abreu (2.-7.11.), M.Ruiz (8.-9.11., day-time operator);HERA Poolweek, HERM33ES workshop 8./9.11.; 45;9.11.-16.11.;A.Sievers;MAMBO2 Poolweek; 46;16.11.-23.11.;M.Gonzalez;HERA Poolweek; 47;23.11.-30.11.;J.Abreu;Reserve Poolweek, End of Summersemester 2010; 48;30.11.-7.12.;D.Riquelme;'''Start of winter semester 2010/11'''; 49;7.12.-14.12.;G.Quintana-Lacaci; 1st MAMBO2 Poolweek; 50;14.12.-21.12.;M.Gonzalez (F.Damour, day-time-operator);1st HERA Poolweek; 51;21.12.-28.12.;D.Riquelme (F.Damour, day-time-operator);; 51;28.12.-4.1.;J.Abreu (J.Santiago, night-time-operator);restart of pools on 7.1.; 1;4.1.2011-11.1.;C.Buchbender (M.Ruiz, night-time-operator);; |
| Line 33: | Line 38: |
| * AodSchedule309, AodSchedule209, AodSchedule109 | * AodSchedule310, AodSchedule210, AodSchedule110 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109 |
