Differences between revisions 291 and 292
Revision 291 as of 2009-10-09 15:31:33
Size: 1732
Editor: gra-lx16
Comment:
Revision 292 as of 2009-10-13 12:03:54
Size: 1729
Editor: visitor3
Comment:
Deletions are marked like this. Additions are marked like this.
Line 23: Line 23:
42;13.10.-20.10;H.Wiesemeyer(13.-16.), C.Buchbender(16.-23.) & M.Gonzalez(13.-16.); (HERA pool, Installation of NIKA on 16.10. with limited access to Rx cabin (about 1hour daily))
43;20.10.-27.10;C.Buchbender(-23.), A.Sievers(23.-27.10.); (NIKA 21.-27.10. T16-09 daytime, PC Meeting 27./28.10.)
42;13.10.-20.10;H.Wiesemeyer(13.-16.), C.Thum(16.-20.) & M.Gonzalez(13.-16.); (HERA pool, Installation of NIKA on 16.10. with limited access to Rx cabin (about 1hour daily))
43;20.10.-27.10;C.Buchbender(20.-23.), A.Sievers(23.-27.10.); (NIKA 21.-27.10. T16-09 daytime, PC Meeting 27./28.10.)

Week Dates AoD Comments
28 7.-14.7. F.Damour (night time op.)/D.Riquelme (7.-10.7)/C.Kramer (10.-13.7.) (11.7. visit, NCS: 6.-9.7.)
29 14.7.-21.7. A.Sievers
30 21.7.-28.7. C.Kramer/C.Buchbender (25.7. visitors - BO, 28.7. visit of German General Consul)
31 28.7.-4.8. G.Quintana-Lacaci
32 4.8.-11.8. R.Aladro (4-7.8)/C.Buchbender (7-11.8) (8.8. visit)
33 11.8.-18.8. C.Buchbender(11.-14.8.)/D.Riquelme(14.-8.8.) (NCS: 10.-13.8.)
34 18.8.-25.8. R. Aladro
35 25.8.-1.9. G.Quintana-Lacaci (MAMBO2 test period)
36 1.9.-8.9. H.Wiesemeyer (Summerschool 4.-11.9., 5.9. visit)
37 8.9.-15.9. G.Paubert (NCS: 14.-17.9.)
38 15.9.-22.9. B.Ocana (Heavy Maintenance: 21.-25.9.)
39 22.9.-29.9. D.Riquelme (IRAM 30 years anniversary 28.-30.9.)
40 29.9.-6.10. R.Aladro HERA pool
41 6.10.-13.10 H.Ungerechts (6.10.-8.10.) & M.Ruiz (entire week) VLBI(8.-13.10.)
42 13.10.-20.10 H.Wiesemeyer(13.-16.), C.Thum(16.-20.) & M.Gonzalez(13.-16.) (HERA pool, Installation of NIKA on 16.10. with limited access to Rx cabin (about 1hour daily))
43 20.10.-27.10 C.Buchbender(20.-23.), A.Sievers(23.-27.10.) (NIKA 21.-27.10. T16-09 daytime, PC Meeting 27./28.10.)
44 27.10.-3.11. R.Aladro & M.Gonzalez Removal of NIKA on 27.10. during Wed maintenance, HERA pool
45 3.11.-10.11. G.Quintana-Lacaci T05-09 + MAMBO pool
46 10.11.-17.11. M.Gonzalez & C.Buchbender HERA pool
47 17.11.-24.11. B.Ocana
48 24.11.-1.12. D.Riquelme HERA pool backup
49 1.12.-8.12.
50 8.12.-15.12.
51 15.12.-22.12.
52 22.12.29.12. D.Riquelme
53 29.12.-5.1.2010

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)