AodSchedule308 <<BR>>
AodSchedule408
Line 9: Line 6:
Week ; Dates ; AoD ; Comments
1;30.12.-6.1.;H.Ungerechts;
2;6.1.-13.1.;G.Paubert;
3;13.1.-20.1.;H.Wiesemeyer/G.Quintana; HERA-Pool, NCS/EMIR Tests: 12.-15.1.
4;20.1.-27.1.;D.Riquelme; HERA-Pool
5;27.1.-2.2.;C.Kramer; HERA-Pool Week No.5
6;2.2.-10.2.;R.Aladro; ABCD
7;10.2.-17.2.;J.Santiago (daytime op); ABCD
8;17.2.-24.2.;D.Riquelme; HERA-Pool Week No.6 + MAMBO-Tests
9;24.2.-3.3.;A.Sievers/G.Quintana; MAMBO-Pool #1 (day) + HERA+ABCD
10;3.3.-10.3.;B.Ocana; MAMBO-Pool #2
11;10.3.-17.3.;R.Aladro ; MAMBO-Pool #3 (night) + EMIR #1: ABCD Dismounting
12;17.3.-24.3.;G.Quintana ; MAMBO-Pool #4 (night) + EMIR #2: Installation & Hardware testing
13;24.3.-31.3.;D.Riquelme ; MAMBO-Pool #5 (few nights) + EMIR #3: Installation & Hardware testing & First Light
14;31.3.-7.4.; C.Kramer; EMIR #4: Commissioning + 30m webcast/100HA on 3.4.
15;7.4.-14.4.;B.Ocana; MAMBO-Pool #6 (Semana Santa, Full Moon)
16;14.4.-21.4.; C.Kramer; EMIR #5: Commissioning
17;21.4.-28.4.; H.Ungerechts/D.Riquelme; EMIR #6: Commissioning & MAMBO Pool
18;28.4.-5.5.;G.Quintana;
19;5.5.-12.5.;M.Ruiz; VLBI(7.-12.5.)
20;12.5.-19.5.;G.Paubert ; (AMIGA-Conference)
21;19.5.-26.5.;H.Wiesemeyer/D.Riquelme/B.Ocana; HW(19.5-22.5) DR(22.5-25.5) BO(New Moon, 25.5.-26.5)
22;26.5.-2.6.;R.Aladro;
23;2.6.-9.6.;B.Ocana/D.Riquelme; BO(2.5-5.5) DR(5.5-9.5)
24;9.6.-16.6.;H.Ungerechts;
25;16.6.-23.6.;H.Wiesemeyer/B.Ocana ; HW(16.6-19.6) BO(19.6-23.6)
26;23.6.-30.6.;R.Aladro;
27;30.6.-7.7.;D.Riquelme;
28;;(Night time op.: Frederic);
29;;(Night time op.: Frederic);
30;;(Night time op.: Joaquin);
31;;;
32;;;
33;;(Day time op.: Joaquin);
34;;(Night time op.: Frederic);
35;
36;
;;;
41;6.10.-13.10.;M.Ruiz; VLBI(8.-13.10.)
;;;;
Week ; Dates ; AoD ; Comments;;
40;5.10.-12.10.2010;M.Ruiz;Global 3mm VLBI (7.-12.10.);
41;12.10.-19.10.;J.Abreu & H.Ungerechts (14.-19.10.); NIKA arrives on 14.10. ;
42;19.10.-26.10.;D.Riquelme; NIKA run + Obs.;
43;26.10.-2.11.;G.Quintana-Lacaci (25.-29.10.), C.Buchbender (29.10.-2.11.), J.Abreu (29.10.-5.11.);MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek;
44;2.11.-9.11.;M.Gonzalez & J.Abreu (2.-7.11.), M.Ruiz (8.-9.11., day-time operator);HERA Poolweek, HERM33ES workshop 8./9.11.;
45;9.11.-16.11.;A.Sievers;MAMBO2 Poolweek;
46;16.11.-23.11.;M.Gonzalez;HERA Poolweek;
47;23.11.-30.11.;J.Abreu;Reserve Poolweek, End of Summersemester 2010;
48;30.11.-7.12.;D.Riquelme;'''Start of winter semester 2010/11''';
49;7.12.-14.12.;G.Quintana-Lacaci; 1st MAMBO2 Poolweek;
50;14.12.-21.12.;M.Gonzalez (F.Damour, day-time-operator);1st HERA Poolweek;
51;21.12.-28.12.;D.Riquelme (F.Damour, day-time-operator);;
51;28.12.-4.1.;J.Abreu (J.Santiago, night-time-operator);restart of pools on Friday 7.1.;
1;4.1.2011-11.1.;C.Buchbender (M.Ruiz, night-time-operator);;
Line 49: Line 23:

Old AoD Plans:
 * AodSchedule310, AodSchedule210, AodSchedule110
 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
 * AodSchedule408, AodSchedule308

Week Dates AoD Comments
40 5.10.-12.10.2010 M.Ruiz Global 3mm VLBI (7.-12.10.)
41 12.10.-19.10. J.Abreu & H.Ungerechts (14.-19.10.) NIKA arrives on 14.10.
42 19.10.-26.10. D.Riquelme NIKA run + Obs.
43 26.10.-2.11. G.Quintana-Lacaci (25.-29.10.), C.Buchbender (29.10.-2.11.), J.Abreu (29.10.-5.11.) MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek
44 2.11.-9.11. M.Gonzalez & J.Abreu (2.-7.11.), M.Ruiz (8.-9.11., day-time operator) HERA Poolweek, HERM33ES workshop 8./9.11.
45 9.11.-16.11. A.Sievers MAMBO2 Poolweek
46 16.11.-23.11. M.Gonzalez HERA Poolweek
47 23.11.-30.11. J.Abreu Reserve Poolweek, End of Summersemester 2010
48 30.11.-7.12. D.Riquelme '''Start of winter semester 2010/11'''
49 7.12.-14.12. G.Quintana-Lacaci 1st MAMBO2 Poolweek
50 14.12.-21.12. M.Gonzalez (F.Damour, day-time-operator) 1st HERA Poolweek
51 21.12.-28.12. D.Riquelme (F.Damour, day-time-operator)
51 28.12.-4.1. J.Abreu (J.Santiago, night-time-operator) restart of pools on Friday 7.1.
1 4.1.2011-11.1. C.Buchbender (M.Ruiz, night-time-operator)