Differences between revisions 209 and 210
Revision 209 as of 2009-01-21 17:25:15
Size: 1057
Editor: visitor3
Comment:
Revision 210 as of 2009-01-21 17:27:43
Size: 1057
Editor: visitor3
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
5;27.1.-3.2.;C.Kramer; HERA-Pool Week No.5
6;3.2.-10.2.;R.Aladro; ABCD
5;27.1.-2.2.;C.Kramer; HERA-Pool Week No.5
6;2.2.-10.2.;R.Aladro; ABCD

AodSchedule308 BR AodSchedule408

Week Dates AoD Comments
1 30.12.-6.1. H.Ungerechts
2 6.1.-13.1. G.Paubert
3 13.1.-20.1. H.Wiesemeyer/G.Quintana HERA-Pool, NCS/EMIR Tests: 12.-15.1.
4 20.1.-27.1. D.Riquelme HERA-Pool
5 27.1.-2.2. C.Kramer HERA-Pool Week No.5
6 2.2.-10.2. R.Aladro ABCD
7 10.2.-17.2. J.Santiago (daytime op) ABCD
8 17.2.-24.2. D.Riquelme HERA-Pool Week No.6 + MAMBO-Tests
9 24.2.-3.3. A.Sievers/G.Quintana MAMBO-Pool Week No.1 + HERA+ABCD
10 3.3.-10.3. B.Ocana MAMBO-Pool #2 + ABCD-Demounting
11 10.3.-17.3. R.Aladro MAMBO-Pool #3 + EMIR Installation
12 17.3.-24.3. G.Quintana (SB,WB,AS,HU,HW) MAMBO-Pool #4 + EMIR cool down and first light (Rx soft)
13 24.3.-31.3. D.Riquelme (WB,AS,HU,HW) MAMBO-Pool #5 + EMIR/NCS Tests
14 31.3.-7.4. C.Kramer (CT,WB,AS,HU,HW) EMIR Commissioning + 30m webcast/100HA on 3.4.
15 7.4.-14.4. B.Ocana MAMBO-Pool
19 5.5.-12.5. M.Ruiz VLBI(7.-12.5.)
41 6.10.-13.10. M.Ruiz VLBI(8.-13.10.)

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)