Differences between revisions 2 and 731 (spanning 729 versions)
Revision 2 as of 2005-10-21 10:01:08
Size: 793
Editor: gra-lx8
Comment:
Revision 731 as of 2013-05-10 09:19:48
Size: 2550
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
=== Last update: Oct. 20th , 2005 === ##language:en
#pragma section-numbers off
Line 3: Line 4:
{{{
#!CSV
;;;;
1; 1.-8.1.2013; G.Bruni;;
2; 8.-15.1.2013; A.Sievers;;
3; 15.-22.1.2013; M.Gonzalez; Pool;
4; 22.-29.1.2013; N.Billot; Pool;
5; 29.1.-5.2.; S.Trevino;;
6; 5.-12.2.; J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.;;
7; 12.-19.2.; N.Billot; Pool, VLBI test on 14. or 18.2.;
8; 19.-26.2.; M.Gonzalez, I.Hermelo (19., 22.-26.2.); Pool;
9; 26.2.-5.3.; J.L.Santaren (night-time operator);;
10; 5.-12.3.; S.Trevino, I.Hermelo;;
11; 12.-19.3.; M.Gonzalez; 11.-13. HEMT installation & alignment, 15.-18. J.LeBourlot with students;
12; 19.-26.3.; G.Paubert (19.-22.3.), I.Hermelo (22.-29.3.); Pool & 1mm VLBI;
13; 26.3.-2.4.; F.Damour (day-time operator), I.Hermelo (22.-29.3.); Pool & 1mm VLBI (till 28.3.), Semana Santa;
14; 2.-9.4.; S.Trevino;;
15; 9.-16.4.; A.Sievers, C.Kramer 12.-18.4.; GISMO-Pool (10./11. PC meeting);
16; 16.-23.4.; I.Hermelo, C.Kramer -18.4.; GISMO-Pool;
17; 23.-30.4.; M.Gonzalez; GISMO-Pool;
18; 30.4.-7.5.; S.Trevino;;
19; 7.-14.5.; I.Hermelo; the road should be open again soon;
20; 14.-21.5.; M.Ruiz; NIKA: exchange of arrays and electronics, 3mm VLBI (16.-22.5.);
21; 21.-28.5.; G.Paubert;;
22; 28.-4.6.; I.Hermelo; Start of Summer Semester;
23; 4.-11.6.; S.Trevino;;
24; 11.-18.6.; N.Billot; NIKA run;
25; 18.-25.6.; A.Sievers;;
26; 25.6.-2.7.; M.Gonzalez;;
27; 2.-9.7.; I.Hermelo;;
28; 9.-16.7.; S.Trevino;;
29; 16.-23.7.; N.Billot;;
30; 23.-30.7.; G.Paubert;;
31; 30.7.-6.8.; I.Hermelo;;
32; 6.-13.8.; F.Damour & J.L.Santaren (Operators);;
33; 13.-20.8.; S.Trevino;;
34; 20.-27.8.; M.Ruiz & J.Santiago (Operators);;
35; 27.8.-3.9.;;;
36; 3.-10.9.;; Proposal deadline: 12.9.;
37; 10.-17.9.;; Summerschool: 13.-20.9., EMIR warm-up: 19.9.;
38; 17.-24.9.;; Heavy Maintenance: 20.-26.;
39; 24.9.-1.10.; M.Ruiz; VLBI: 26.-30.9.;
40; 1.-8.10.; S.Trevino;;
41; 8.-15.10.; M.Gonzalez; Heterodyne pool;
42; 15.-22.10.; A.Sievers; Heterodyne pool;
43; 22.-29.10.; I.Hermelo; GISMO pool;
44; 29.10.-5.11.; M.Gonzalez; GISMO pool;
45; 5.-12.11.; ;;
46; 12.-19.11.; N.Billot;;
47; 19.-26.11.; ;;
48; 26.11.-3.12.; ;;
49; 3.-10.12.; ;;
50; 10.-17.12.; N.Billot;;
51; 17.-24.12.; ;;
52; 24.-31.12.; ;;
}}}
Line 4: Line 61:

{{{#!CSV
Week ; Dates ; AoD ; Comments
40 ; 4.10.-11.10.2005 ; Martin (Tue-Fri),Sievers (Fri-Tue) ; Summerschool till Friday, Martin can be contacted at summerschool.
41 ; 11.10.-18.10. ; Ruiz ; Ruiz can be contacted during his shift, VLBI Thu-Tue.
42 ; 18.10.-25.10. ; Marcelino (Tue-Fri),Leon (Fri-Tue) ; Fri-Tue: Pool.
43 ; 25.10.-1.11. ; Leon ; Pool.
44 ; 1.11.-8.11. ; Martin ; Pool (during the night). Coordinator: Leon (Granada). During day: NCS work
45 ; 8.11.-15.11. ; Leon;Pool (during the night), during day: NCS work
46 ; 15.11.-22.11. ; Ungerechts (Tue-Fri) ;
47 ; 22.11.-29.11. ; ;
48 ; 29.11.-6.12. ; ;
49 ; 6.12.-13.12. ; ;
50 ; 13.12.-20.12. ; ;
51 ; 20.12.-27.12. ; ;
52 ; 27.12.05-3.1.2006 ; ;
}}}
Old AoD Plans:
 * AodSchedule112, AodSchedule212, AodSchedule3412
 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111
 * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110
 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
 * AodSchedule408, AodSchedule308

1 1.-8.1.2013 G.Bruni
2 8.-15.1.2013 A.Sievers
3 15.-22.1.2013 M.Gonzalez Pool
4 22.-29.1.2013 N.Billot Pool
5 29.1.-5.2. S.Trevino
6 5.-12.2. J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.
7 12.-19.2. N.Billot Pool, VLBI test on 14. or 18.2.
8 19.-26.2. M.Gonzalez, I.Hermelo (19., 22.-26.2.) Pool
9 26.2.-5.3. J.L.Santaren (night-time operator)
10 5.-12.3. S.Trevino, I.Hermelo
11 12.-19.3. M.Gonzalez 11.-13. HEMT installation & alignment, 15.-18. J.LeBourlot with students
12 19.-26.3. G.Paubert (19.-22.3.), I.Hermelo (22.-29.3.) Pool & 1mm VLBI
13 26.3.-2.4. F.Damour (day-time operator), I.Hermelo (22.-29.3.) Pool & 1mm VLBI (till 28.3.), Semana Santa
14 2.-9.4. S.Trevino
15 9.-16.4. A.Sievers, C.Kramer 12.-18.4. GISMO-Pool (10./11. PC meeting)
16 16.-23.4. I.Hermelo, C.Kramer -18.4. GISMO-Pool
17 23.-30.4. M.Gonzalez GISMO-Pool
18 30.4.-7.5. S.Trevino
19 7.-14.5. I.Hermelo the road should be open again soon
20 14.-21.5. M.Ruiz NIKA: exchange of arrays and electronics, 3mm VLBI (16.-22.5.)
21 21.-28.5. G.Paubert
22 28.-4.6. I.Hermelo Start of Summer Semester
23 4.-11.6. S.Trevino
24 11.-18.6. N.Billot NIKA run
25 18.-25.6. A.Sievers
26 25.6.-2.7. M.Gonzalez
27 2.-9.7. I.Hermelo
28 9.-16.7. S.Trevino
29 16.-23.7. N.Billot
30 23.-30.7. G.Paubert
31 30.7.-6.8. I.Hermelo
32 6.-13.8. F.Damour & J.L.Santaren (Operators)
33 13.-20.8. S.Trevino
34 20.-27.8. M.Ruiz & J.Santiago (Operators)
35 27.8.-3.9.
36 3.-10.9. Proposal deadline: 12.9.
37 10.-17.9. Summerschool: 13.-20.9., EMIR warm-up: 19.9.
38 17.-24.9. Heavy Maintenance: 20.-26.
39 24.9.-1.10. M.Ruiz VLBI: 26.-30.9.
40 1.-8.10. S.Trevino
41 8.-15.10. M.Gonzalez Heterodyne pool
42 15.-22.10. A.Sievers Heterodyne pool
43 22.-29.10. I.Hermelo GISMO pool
44 29.10.-5.11. M.Gonzalez GISMO pool
45 5.-12.11.
46 12.-19.11. N.Billot
47 19.-26.11.
48 26.11.-3.12.
49 3.-10.12.
50 10.-17.12. N.Billot
51 17.-24.12.
52 24.-31.12.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)