|
Size: 2087
Comment:
|
Size: 1407
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 4: | Line 4: |
| AodSchedule3-08 [[BR]] | |
| Line 11: | Line 10: |
| 40;30.9.-7.10.;H.Wiesemeyer;HERA pool 41;7.10.-15.10.;F.Damour (7.-9.10.), M.Ruiz (9.-15.10.);VLBI (F.Damour can be contacted during his night shift) 42;14.10.-21.10.;R.Aladro (Tue-Fri), D.Riquelme (Fri-Tue);HERA pool (GISMO installation) 43;21.10.-28.10.;H.Ungerechts (Tue-Thu), A.Sievers (Thu-Tue);GISMO observations, TT NCS 27.-30.10. 44;28.10.-4.11.;R.Aladro (28.-31.10.), D.Riquelme (31.10.-7.11.); HERA-Pool 45;4.11.-11.11.;D.Riquelme (31.10.-7.11.), R.Aladro (7.11.-11.11.); MAMBO-Tests 46;11.11.-18.11.;B.Ocana; MAMBO-Pool 47;18.11.-25.11.;D.Riquelme; MAMBO-Pool 48;25.11.-2.12.;F.Damour (nighttime), M.Ruiz (daytime); ABCD-Calibrators, NCS/EMIR Tests: 24.-27.11. 49;2.12.-9.12.;F.Damour; (F.Damour can be contacted during his nighttime shift) 50;9.12.-16.12.;J.Santiago; HERA-Pool (J.Santiago can be contacted during his nighttime shift) 51;16.12.-23.12.;H.Wiesemeyer/B.Ocana (from Granada); HERA-Pool, NCS/EMIR Tests: 15.12.-18.12. 52;23.12.-30.12.;R.Aladro; |
|
| Line 26: | Line 12: |
| 3;13.1.-20.1.;H.Wiesemeyer/G.Quintano?; HERA-Pool, NCS/EMIR Tests: 12.-15.1. | 3;13.1.-20.1.;H.Wiesemeyer/G.Quintana; HERA-Pool, NCS/EMIR Tests: 12.-15.1. |
| Line 28: | Line 14: |
| 5;27.1.-3.2.;C.Kramer; HERA-Pool Week No.5 6;3.2.-10.2.;R.Aladro; ABCD |
5;27.1.-2.2.;C.Kramer; HERA-Pool Week No.5 6;2.2.-10.2.;R.Aladro; ABCD |
| Line 31: | Line 17: |
| 8;17.2.-24.2.;D.Riquelme?; HERA-Pool Week No.6 + MAMBO-Tests 9;24.2.-3.3.;A.Sievers/G.Quintano?; MAMBO-Pool Week No.1 + HERA+ABCD 10;3.3.-10.3.;B.Ocana; MAMBO-Pool #2 + ABCD-Demounting 11;10.3.-17.3.;R.Aladro; MAMBO-Pool #3 + EMIR Installation 12;17.3.-24.3.;G.Quintano? (WB,AS,HU,HW); MAMBO-Pool #4 + EMIR cool down and first light 13;24.3.-31.3.;D.Riquelme? (WB,AS,HU,HW); MAMBO-Pool #5 + EMIR/NCS Tests 14;31.3.-7.4.;B.Ocana (WB,AS,HU,HW); MAMBO-Pool #6 + EMIR/NCS Tests + 100h Astronomy Event on April 3-4 15;7.4.-14.4.;C.Kramer (CT?); EMIR Commissioning ;;; |
8;17.2.-24.2.;D.Riquelme; HERA-Pool Week No.6 + MAMBO-Tests 9;24.2.-3.3.;A.Sievers/G.Quintana; MAMBO-Pool #1 (day) + HERA+ABCD 10;3.3.-10.3.;B.Ocana; MAMBO-Pool #2 11;10.3.-17.3.;R.Aladro ; MAMBO-Pool #3 (night) + EMIR #1: ABCD Dismounting 12;17.3.-24.3.;G.Quintana ; MAMBO-Pool #4 (night) + EMIR #2: Installation & Hardware testing 13;24.3.-31.3.;D.Riquelme ; MAMBO-Pool #5 (few nights) + EMIR #3: Installation & Hardware testing & First Light 14;31.3.-7.4.; C.Kramer; EMIR #4: Commissioning + 30m webcast/100HA on 3.4. 15;7.4.-14.4.;B.Ocana; MAMBO-Pool #6 (Semana Santa, Full Moon) 16;14.4.-21.4.; C.Kramer; EMIR #5: Commissioning 17;21.4.-28.4.; D.Riquelme; EMIR #6: Commissioning & MAMBO Pool 18;28.4.-5.5.; ; |
| Line 41: | Line 29: |
| 20;12.5.19.5.; ; (AMIGA-Conference) 21;19.5.-26.5.;B.Ocana; 22;26.5.-2.6.;R.Aladro; 23;2.6.-9.6.; ; 24;9.6.-16.6.; ; 25;16.6.-23.6.;B.Ocana ; 26;23.6.-30.6.;R.Aladro; |
