Differences between revisions 19 and 997 (spanning 978 versions)
Revision 19 as of 2005-12-12 10:44:13
Size: 1480
Editor: visitor11
Comment:
Revision 997 as of 2016-11-23 08:48:34
Size: 702
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
=== Last update: Dec. 12th , 2005 === {{{
#!CSV
;;;;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week, 4./5. 0.8mm VLBI 30m-NOEMA test slot;
2; 10.-17.1.; H.Ungerechts (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch to mrt-cal ?;
4; 24.-31.1.; P.Garcia; NIKA2 commissioning week ?;
5; 31.1.-7.2.;;;
}}}
Line 6: Line 14:
{{{#!CSV
Week ; Dates ; AoD ; Comments
40 ; 4.10.-11.10.2005 ; Martin (Tue-Fri),Sievers (Fri-Tue) ; Summerschool till Friday, Martin can be contacted at summerschool.
41 ; 11.10.-18.10. ; Ruiz ; Ruiz can be contacted during his shift, VLBI Thu-Tue.
42 ; 18.10.-25.10. ; Marcelino (Tue-Fri),Leon (Fri-Tue) ; Fri-Tue: Pool.
43 ; 25.10.-1.11. ; Leon ; Pool.
44 ; 1.11.-8.11. ; Martin ; Pool (during the night). Coordinator: Leon (Granada). During day: NCS work
45 ; 8.11.-15.11. ; Leon;Pool (during the night), during day: NCS work
46 ; 15.11.-22.11. ; Ungerechts (Tue-Fri), Ruiz (Fri-Tue) ;Ruiz can be contacted during his day shift
47 ; 22.11.-29.11. ;NCS team (Tue-Fri), Ruiz (Fri-Tue);
48 ; 29.11.-6.12. ;Leon ; Pool
49 ; 6.12.-13.12. ;Marcelino ; Pool (Leon coordinator, Granada)
50 ; 13.12.-20.12. ;Leon ; Pool
51 ; 20.12.-27.12. ;Marcelino ; NCS assistance: 20-22.12. AS (PV);
52 ; 27.12.05-3.1.2006 ;Martin; NCS assistance: 27.-29.12. HU (PV)
1 ; 3.1.06-10.1.06;Ungerechts(Tue-Fri), Sievers (Fri-Tue);
2 ; 10.1.-17.1.;Leon;Pool
3 ; 17.1.-24.1.; Marcelino;Pool (Leon Coord. Granada)
4 ; 24.1.-31.1.;Leon;Pool
5 ; 31.1.-7.2.;;
6 ; 7.2.-14.2.;Ungerechts; Hera Pool (?)
7 ; 14.2.-21.2.;; Hera Pool (?)
8 ; 21.2.-28.2.;Leon; Pool
9 ; 28.2.-7.3.; Marcelino; Pool (Leon Coord Granada))
10; 7.3.-14.3.;Leon; Pool
11; 14.3.-21.3.;; reserve for Pool
}}}
Old AoD Plans:
 * AodSchedule16
 * AodSchedule15
 * AodSchedule14
 * AodSchedule13
 * AodSchedule112, AodSchedule212, AodSchedule3412
 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111
 * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110
 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
 * AodSchedule408, AodSchedule308

1 3.-10.1. P.Torne Heterodyne Pool Week, 4./5. 0.8mm VLBI 30m-NOEMA test slot
2 10.-17.1. H.Ungerechts (remote from Granada)
3 17.-24.1. A.Sievers Switch to mrt-cal ?
4 24.-31.1. P.Garcia NIKA2 commissioning week ?
5 31.1.-7.2.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)