Differences between revisions 177 and 178
Revision 177 as of 2008-12-15 19:29:37
Size: 1491
Editor: 20
Comment:
Revision 178 as of 2008-12-15 19:33:45
Size: 1503
Editor: 20
Comment:
Deletions are marked like this. Additions are marked like this.
Line 31: Line 31:
9;24.2.-3.3.;; MAMBO-Pool Week No.1 9;24.2.-3.3.;; MAMBO-Pool Week No.1 + HERA+ABCD

AodSchedule3-08

Week Dates AoD Comments
40 30.9.-7.10. H.Wiesemeyer HERA pool
41 7.10.-15.10. F.Damour (7.-9.10.), M.Ruiz (9.-15.10.) VLBI (F.Damour can be contacted during his night shift)
42 14.10.-21.10. R.Aladro (Tue-Fri), D.Riquelme (Fri-Tue) HERA pool (GISMO installation)
43 21.10.-28.10. H.Ungerechts (Tue-Thu), A.Sievers (Thu-Tue) GISMO observations, TT NCS 27.-30.10.
44 28.10.-4.11. R.Aladro (28.-31.10.), D.Riquelme (31.10.-7.11.) HERA-Pool
45 4.11.-11.11. D.Riquelme (31.10.-7.11.), R.Aladro (7.11.-11.11.) MAMBO-Tests
46 11.11.-18.11. B.Ocana MAMBO-Pool
47 18.11.-25.11. D.Riquelme MAMBO-Pool
48 25.11.-2.12. F.Damour (nighttime), M.Ruiz (daytime) ABCD-Calibrators, NCS/EMIR Tests: 24.-27.11.
49 2.12.-9.12. F.Damour (F.Damour can be contacted during his nighttime shift)
50 9.12.-16.12. J.Santiago HERA-Pool (J.Santiago can be contacted during his nighttime shift)
51 16.12.-23.12. B.Ocana HERA-Pool, NCS/EMIR Tests: 15.12.-18.12.
52 23.12.-30.12. R.Aladro
1 30.12.-6.1. H.Ungerechts
2 6.1.-13.1. G.Paubert
3 13.1.-20.1. H.Wiesemeyer HERA-Pool, NCS/EMIR Tests: 12.-15.1.
4 20.1.-27.1. D.Riquelme HERA-Pool
5 27.1.-3.2. HERA-Pool Week No.5
6 3.2.-10.2. ABCD
7 10.2.-17.2. ABCD
8 17.2.-24.2. HERA-Pool Week No.6
9 24.2.-3.3. MAMBO-Pool Week No.1 + HERA+ABCD
10 3.3.-10.3.
11 10.3.-17.3.
12 17.3.-24.3.
13 24.3.-31.3.
14 31.3.-7.4.
15 7.4.-14.4.

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)